[1] 水利电力部水文局.中国水资源评价[M].北京:水利电力出版社,1987.
Ministry of Water Resources Hydrology Bureau.Evaluation of Water Resources in China[M].Beijing:China Water & Power Press,1987.
[2] 骆承政,乐嘉祥.中国大洪水——灾害性洪水述要[M].北京:中国书店,1996.
Luo Chengzheng,Le Jiaxiang.Flood in China-Introduction of Devastating Flood[M].Beijing:China Bookstore,1996.
[3] 张行南,罗健,陈雷,等.中国洪水灾害危险程度区划[J].水利学报,2000(3):1-7.
Zhang Xingnan,Luo Jian,Chen Lei,et al.Zoning of Chinese flood hazard risk[J].Journal of Hydraulic Engineering,2000(3):1-7.
[4] 张欧阳,许炯心,张红武,等.洪水的灾害与资源效应及其转化模式[J].自然灾害学报,2003,12(1):25-30.
Zhang Ou’yang,Xu Jiongxin,Zhang Hongwu,et al.Flood hazards and resources effects and their inter-transform mode[J].Journal of Natural Disasters,2003,12(1):25-30.
[5] 高吉喜,潘英姿,柳海鹰,等.区域洪水灾害易损性评价[J].环境科学研究,2004,17(6):30-34.
Gao Jixi,Pan Yingzi,Liu Haiying,et al.Assessment on regional vulnerability to flood[J].Research of Environmental Sciences,2004,17(6):30-34.
[6] 黄志才,吴国雄,程尊兰.川藏公路沿河路基水毁成因分析与工程防护[J].水土保持通报,2003,23(4):21-23.
Huang Zhicai,Wu Guoxiong,Cheng Zunlan.Research on causes and prevention methods of water damage to Sichuan-Tibet highway[J].Bulletin of Soil and Water Conservation,2003,23(4):21-23.
[7] 刘志辉.基于“3S”技术的新疆融雪洪水预测预警及决策支持研究[D].徐州:中国矿业大学,2009.
Liu Zhihui.The Prediction,Early-Warning for Snowmelt Flood and Decision Support based on ‘3S’ Technologies in Xinjiang[D].Xuzhou:China University of Mining and Technology,2009.
[8] 张一驰,李宝林,包安明,等.开都河流域融雪径流模拟研究[J].中国科学D辑:地球科学,2006,36 (增刊2):24-32.
Zhang Yichi,Li Baolin,Bao An’ming,et al.Research on the simulation of Kaidu River`s snowmelt runoff[J].Science in China Series D:Earth Sciences,2006,36 (Sup2):24-32.
[9] 于海鸣,刘建基.新疆丘陵区小流域春季融雪设计洪水估算[J].水利规划与设计,2005(3):25-28.
Yu Haiming,Liu Jianji.Estimating design flood of the spring snow melt in Xinjiang[J].Water Resources Planning and Design,2005(3):25-28.
[10]田伟平,李惠萍,高冬光.沿河路基冲刷机理与冲刷深度[J].长安大学学报:自然科学版,2002,22(4):39-42.
Tian Weiping,Li Huiping,Gao Dongguang.Scour depth and mechanism of highway subgrade along river[J].Journal of Chang’an University:Natural Science Edition,2002,22(4):39-42.
[11]吴国雄,黄志才.沿河路基局部冲刷深度计算研究[J].中国公路学报,2005,18(4):12-15.
Wu Guoxiong,Huang Zhicai.Research on local scour depth calculation of roadbed along river[J].China Journal of Highway and Transport,2005,18(4):12-15.
[12]杜明格,刘国东.无资料地区径流量计算方法的探讨[J].重庆交通大学学报:自然科学版,2007,26(4):138-141.
Du Mingge,Liu Guodong.Discussion on the runoff calculation method for the area no data recorded[J].Journal of Chongqing Jiaotong University:Natural Science,2007,26(4):138-141.
[13]童思陈,高建,许光祥,等.弯道水流纵向垂线平均流速分布的计算[J].重庆交通大学学报:自然科学版,2009,28(1):126-129.
Tong Sichen,Gao Jian,Xu Guangxiang,et al.Calculation of the longitudinal depth averaged velocity distribution of curved conduit flow[J].Journal of Chongqing Jiaotong University:Natural Science,2009,28(1):126-129.
[14]Ansari S A.Influence of cohesion on scour and bridge piers[J].Journal of Hydraulic Research,2002,40 (6):717-729.
|