[1] SL 269—2001水利水电工程沉沙池设计规范[S].北京:中国水利水电出版社,2001.
SL 269—2001 Design Code for Settling Basin of Water Conservancy and Hydropower Projects [S].Beijing:China Waterpower Press,2001.
[2] 涂启华,杨赉斐.泥沙设计手册[M].北京:中国水利水电出版社,2006.
Tu Qihua,Yang Laifei.Sediment Design Manual [M].Beijing:China Water Conservancy and Hydropower Press,2006.
[3] 黄胜,卢启苗.河口动力学[M].北京:水利电力出版社,1992.
Huang Sheng,Lu Qimiao.Estuary Dynamics [M].Beijing:Water Conservancy and Electric-Power Press,1992.
[4] 洪振国.沉沙池几种计算方法应用探讨[J].中国农村水利水电,2013(1):129-131.
Hong Zhenguo.Several calculation methods of application of settling basin [J].China Rural Water and Hydropower,2013(1):129-131.
[5] 熊启钧.灌区建筑物的水力计算与结构计算[M].北京:中国水利水电出版社,2007.
Xiong Qijun.Hydraulic Calculation and Structural Calculation of Irrigation Structures [M].Beijing:China Waterpower Press,2007.
[6] 洪振国.定期冲洗式沉沙池截沙率应用研究[J].中国农村水利水电,2013(3):107-109.
Hong Zhenguo.Periodic flushing settling basin sand interception rate of applied research [J].China Rural Water and Hydropower,2013(3):107-109
[7] 洪振国,王鹏.水电站沉沙池布置方案比选研究[J].红水河,2014,33 (3):29-32.
Hong Zhenguo,Wang Peng.Study on selection of layout scheme for settling basin of hydropower station [J].Hongshui River,2014,33 (3):29-32.
[8] 洪振国,洪振权.水电站的防沙措施[J].东北水利水电,2014(10):6-8.
Hong Zhenguo,Hong Zhenquan.Treatment measures of sediment hydropower station [J].Water Resources & Hydropower of Northeast China,2014(10):6-8.
[9] 洪振国,洪振权.沉沙池结构型式的选取方法[J]. 水利规划与设计,2015 (9):105-108.
Hong Zhenguo,Hong Zhenquan.Methods of settling basin structure[J]. Water Resources Planning and Design,2015(9):105-108.
[10]顾四行.我国水轮机泥沙磨损研究50年[J]. 水电站机电技术,2005,28(6):60-62.
Gu Sihang. Research on abrasion and cavitation of hydro turbine in fifty years [J]. Mechanical & Electrical Technique of Hydropower Station,2005, 28(6):60-62.
[11]顾四行,贾瑞旗,张弋扬,等.水轮机磨蚀与防治[J]. 水利水电工程设计,2011,30(1):39-43.
Gu Sihang,Jia Ruiqi,Zhang Yiyang,et al. Abrasion of turbine and protection[J]. Design of Water Resources & Hydroelectric Engineering,2011,30(1):39-43.
[12]水利部水利水电规划设计总院.水工设计手册 [M]. 2 版. 北京:中国水利水电出版社,2014.
The Ministry of water conservancy and hydropower planning and Design Institute. Manual Hydraulic Design [M].2nd ed. Beijing: China Water & Power Press,2014.
[13]张绪进,张金林,周勤,等.泥沙淤积对电厂取水口影响研究 [J].重庆交通大学学报:自然科学版,2013,32(5):1035-1038.
Zhang Xujin,Zhang Jinlin,Zhou Qin,et al.Influence of reservoir sediment deposition on water-intake of power plant [J].Journal of Chongqing Jiaotong University:Natural science,2013,32(5):1035-1085. |