[1]张浩.刚架拱桥病害分析及体外预应力加固探索[D].重庆: 重
庆交通大学, 2012.
Zhang Hao.Disease Analysis and Study on the Consolidation by
External Pre-stressed Technique in Rigid-Frame Arch Bridge [D].
Chongqing: Chongqing Jiaotong University,2012.
[2]JTJ 021—85 公路桥涵设计通用规范[S].北京: 人民交通出版
社,1
985.
JTJ 021—85 General Code for Design of Highway Bridges and Culverts
[S].Beijing: China Communications Press,1985.
[3]JTG D 60—2004 公路桥涵设计通用规范[S].北京: 人民交通
出版社,2
004.
JTG D 60—2004 General Specifications for Design of Highway
Bridges and Culverts [S].Beijing: China Communications Press,
2004.
[4]张惠勤,吕长荣.刚架拱桥的检测与承载能力评定[J].山东交
通学院学报, 2009, 17(2): 56-62.
Zhang Huiqin,Lv Changrong.Detection and bearing capacity evaluation
of rigid frame arch bridge [J].Journal of Shandong Jiaotong
University,2009,17(2): 56-62.
[5]JTG/T J 21—2011 公路桥梁承载能力检测评定规程[S].北
京: 人民交通出版社,2
011.
JTG/T J 21—2011 Specification for Inspection and Evaluation of
Load-Bearing Capacity of Highway Bridge [S].Beijing: China
Communications Press,2011.
[6]刘劲草,王永光.钢筋混凝土刚架拱桥荷载试验[J].吉林交通
科技, 2009(1): 40-42.
Liu Jincao,Wang Yongguang.Load test of reinforced concrete rigid
frame arch bridge [J].Science and Technology of Jilin Traffic,
2009 (1): 40-42.