[1] 毛昶熙.渗流计算分析与控制[M].北京:水利电力出版社,1990.
MAO Changxi. Seepage Computation Analysis and Control[M]. Beijing: China Water Power Press,1990.
[2] 柴军瑞.大坝工程渗流力学[M].拉萨:西藏人民出版社,2001.
CAI Junrui. Seepage Theory for Dam Engineering[M]. Lhasa:Tibet People’s Press,2001.
[3] 袁勤国,陈思翌.湖北省中小型水库土石坝渗漏原因及防渗处理[J].长江科学院院报,2009,26(增刊1):76-80.
YUAN Qinguo,CHEN Shiyi. Analysis and anti-seepage treatment of leakage of small and medium-sized reservoir in Hubei province[J]. Journal of Yangtze River Scientific Research Institute,2009,26 (Sup1) :76-80.
[4] 郭文玮.仁宗海堆石坝初蓄期渗流异常分析[D].成都:成都理工大学,2011.
GUO Wenwei.The Analysis of the Abnormality of Seepage of the Renzonghai Rock-Fill Dam at the Initial Water[D]. Chengdu : Chengdu University of Technology.2011.
[5] 李刚,李军,杨开华.某土石坝帷幕灌浆渗流监测成果分析[J].长江科学院院报,2012,29(5):86-89.
LI Gang,LI Jun,YANG Kaihua. Analysis of seepage monitoring data for an earth-rock dam after curtain grouting[J]. Journal of Yangtze River Scientific Research Institute,2012,29(5):86-89.
[6] 陈勇,李进,张莉萍,等.南京市赭山头水库坝肩渗漏处理[J].水文地质工程地质,2011,38(5):76-79.
CHEN Yong, LI Jin, ZHANG Liping, et al. Diaphragm treatment in Zheshantou Dam abutment of Nanjing City[J]. Hydrogeology & Engineering Geology,2011,38(5):76-79.
[7] 闫建文.土石坝坝体的渗漏处理[J].陕西工学院学报,2002,18(4):72-75.
YAN Jianwen. Solutions to the problem of leakage in the rock-filled dam[J].Journal of Shaanxi Institute of Technology,2002,18(4):72-75
[8] 李福林,张保祥,韩延树.午山水库大坝下游渗漏的物探分析[J].大坝观测与土工测试,2000,24(5):27-29.
LI Fulin,ZHANG Baoxiang,HAN Yanshu. Analysis of geophysical survey of the leakage zone in the Wushan dam[J]. Dam Observation and Geotechnical Tests,2000,24(5):27-29. |