Passing program designing and practice on the heavy-duty equipments of Baihe power station which have to pass bridges and culverts

MENG Yun1, FU Xin-hua2, PENG Zuo-jun3   

  1. 1. School of Civil Engieering & Architecture, Chongqing Jiaotong University, Chongqing 400074, China;
    2. Chongqing Highway Heavy-duty Transportation Co., Chongqing 400081, China;
    3. Chongqing Sigongli Architecture Engineering Ltd. Chongqing 400067, China
  • Received:2004-11-04 Revised:2004-12-02 Online:2005-12-15 Published:2016-11-09

特重设备途经多座桥涵通行方案设计与实践

蒙云1, 傅新华2, 彭作军3   

  1. 1. 重庆交通学院 土木建筑学院, 重庆 400074;
    2. 重庆公路大件运输公司, 重庆 400081;
    3. 重庆市四公里建筑工程有限公司, 重庆 400067
  • 作者简介:蒙云(1949-),男,重庆合川人,教授,主要从事大跨径桥梁结构体系、计算理论、新材料、新结构、新技术及桥梁加固与改造技术研究

Abstract: Carrying the heavy-duty equipments of Baihe power station to the factory have to pass 121 bridges and culverts. If using the traditional methods to consolidate all the bridges and culverts, the lose of economy is gigantic. Not only because of the big investment and long project time limit, but also electricity generating will be delayed. Through the repetition testification, employed the scheme which included direct pass, erected the temporary steel bridges, consolidation and supplying the intensity. This scheme can carry the equipments to the factory economically, quickly and safely. Moreover, it started a referential new way for interior of country heavy-duty transportation.

Key words: heavy-duty, bridges and culverts, passing program designing, practice

摘要: 运输白鹤电厂重型设备到厂区需要通过121座桥涵,按传统方式对全部桥涵加固后通过,不仅投资大,工期长,而且延误发电经济损失巨大.通过反复论证,采用了直接通过,架临时钢桥和加固补强三种方案结合,经济、快速、安全将设备运到了厂区,为我国大件运输开创了一条可供参考的新途径.

关键词: 重载, 桥涵, 方案设计, 实践