[1] 周建庭,郝义,刘国金,等.石拱桥合理加固工序及内力分析[J].公路,2005(4):33-35.
Zhou Jianting,Hao Yi,Liu Guojing,et al.Reasonable reinforced program and inner force analysis for masonry arch bridge[J].Highway,2005(4):33-35.
[2] 周建庭,邓智,袁瑞,等.劣化拱轴线大跨石拱桥拱上建筑调载工序研究[J].重庆交通大学学报:自然科学版,2010,29(1):16-19.
Zhou Jianting,Deng Zhi,Yuan Rui,et al.Adjusting load process of spandrel construction for large-span stone arch bridge with deteriorated arch axis[J].Journal of Chongqing Jiaotong University:Natural Science,2010,29(1):16-19.
[3] 黄泽权,梅盖伟,杨兴.拱桥有支架施工加载程序优化设计[J].重庆交通大学学报:自然科学版,2009,28(1):23-25.
Huang Zequan,Mei Gaiwei,Yang Xing.Optimization design of loading procedure of trestle construction of arch bridge[J].Journal of Chongqing Jiaotong University:Natural Science,2009,28(1):23-25.
[4] 钟建国,唐诚.钢管混凝土拱桥外包段混凝土施工顺序探讨[J].公路交通技术,2004(3):61-62.
Zhong Jianguo,Tang Cheng.Discussion on construction procedures for sections enclosed in concrete of steel pipe concrete arch bridges[J].Technology of Highway and Transport,2004(3):61-62.
[5] 尼玛·卓玛.加载程序设计在无支架钢筋混凝土箱形拱桥施工中的运用[J].林业建设,2005(6):36-37.
Nima·Zhuoma.Application of loading program design during construction of reinforcement concrete box arch bridge without supports[J].Forestry Construction,2005(6):36-37.
[6] 余钱华,罗波,张凯,等.大跨度拱桥加载程序优化分析[J].公路与汽运,2009(1):122-125.
Yu Qianhua,Luo Bo,Zhang Kai,et al.Optimization and analysis of loading program for long-span arch bridge[J].Highways and Automotive Application,2009(1):122-125.
|