[1] 刘翠容,赵世刚.泥石流阻塞大河机理试验研究[J].重庆交通大学学报(自然科学版),2016,35(1):90-95.
LIU Cuirong, ZHAO Shigang. Experimental study on mechanism of large river blocking by debris flow[J]. Journal of
Chongqing Jiaotong University(Natural Science), 2016, 35(1): 90-95.
[2] 蒋先刚,崔鹏,王兆印,等.堰塞坝溃口下切过程试验研究[J].四川大学学报(工程科学版),2016,48(4):39-44.
JIANG Xiangang, CUI Peng, WANG Zhaoyin, et al. Experiments investigation on longitudinal breaching of natural dam
[J].Journal of Sichuan University (Engineering Science Edition), 2016,48(4):39-44.
[3] 柴贺军,刘汉超,张倬元,等.天然土石坝稳定性初步研究[J].地质科技情报,2001,20(1):77-81.
CHAI Hejun, LIU Hanchao, ZHANG Zhuoyuan, et al. Preliminarily stability analysis of natural rock-field dam resulting from
damming landslide[J].Geological Science and Technology Information, 2001, 20(1): 77-81.
[4] WU Weiming.Simplified physicallybased model of earthen embankment breaching[J]. Journal of Hydraulic Engineering,
2013, 139(8): 837-851.
[5] BRITTON S L, HANSON G J, COOK K R, et al. Breach widening observations from earthen embankment tests[C]//
ASAE/CSAE 2004 Annual International Meeting. Fairmout Chateau Laurier, the Westin, Government Centre Ottawa Ontario,
Canada, 2004: 1-4.
[6] CAO Zhixian, YUE Zhiyuan, PENDER G. Landslide dam failure and flood hydraulics: PartⅠ: experimental investigation
[J]. Natural Hazards, 2011,59(2):1003-1019.
[7] Al-RIFFAI M.Experimental Study of Breach Mechanics in Overtopped Non-cohesive Earthen Embankments[D]. Ottawa,
Canada: University of Ottawa, 2014.
[8] XU Fugang, ZHOU Hongwei, ZHOU Jiawen, et al. A mathematical model for forecasting the dam-break flood routing
process of a landslide dam[J].Mathematical Problems in Engineering, 2012: 1-16.
[9] WALDER J S, IVERSON R M, GODT J W, et al. Controls on the breach geometry and flood hydrograph during overtopping of
non-cohesive earthen dams[J]. Water Resources Research, 2015, 51(8):6701-6724.
[10] 杨阳,曹叔尤.堰塞坝漫顶溃决与演变水槽试验指标初探[J].四川大学学报(工程科学版),2015,47(2):1-7.
YANG Yang, CAO Shuyou. Preliminary study on similarity criteria of the flume experiment on the breach process of the
landslide dams by overtopping[J].Journal of Sichuan University (Engineering Science Edition), 2015,47(2):1-7.
[11] 周兴波,陈祖煜,李守义,等.高风险等级堰塞湖应急处置洪水重现期标准[J].水利学报,2015,46(4):405-413.
ZHOU Xingbo, CHEN Zuyu, LI Shouyi, et al. On the standard of flood return period for high risk barrier lake in emergency
disposal[J]. Journal of Hydraulic Engineering, 2015,46(4):405-413.
[12] 陈晓清,赵万玉,高全,等.堰塞湖溃决人工结构体滞洪效果实验研究[J].山地学报,2011,29(2):217-225.
CHEN Xiaoqing, ZHAO Wanyu, GAO Quan, et al. Experimental research on effect of man-made structure controlling dam- break
flood[J].Journal of Mountain Science, 2011,29(2): 217-225.
[13] 陈晓清,赵万玉,高全,等.人工结构体控制堰塞湖溃决洪峰的试验与设计[J].西南交通大学学报,2011,46(2):228-234.
CHEN Xiaoqing, ZHAO Wanyu, GAO Quan, et al. Experimental investigation and design of artificial structures controlling
dam-break floods[J]. Journal of Southwest Jiaotong University, 2011,46(2): 228-234.
[14] 赵万玉,陈晓清,高全.地震堰塞湖人工排泄断面优化初探[J].灾害学,2010,25(2):26-29.
ZHAO Wanyu, CHEN Xiaoqing, GAO Quan. Preliminary discussion on optimizing artificial drainage sections of earthquake
dammed lakes[J]. Journal of Catastrophology, 2010,25(2): 26-29.
[15] 白金朋,刘艳,杨锁斌.堰塞坝的工程地质分类与应急处置措施研究[C]// 中国水利学会2014学术年会论文集.北京:中国水 利学
会.2014:675-679.
BAI Jinpeng,LIU Yan, YANG Suobin. The study of the engineering geology classifications and the emergency disposal measures
of barrier dams[C]//Proceedings of the Chinese Academy of Water Conservancy 2014. Beijing: Chinese Hydraulic Engineering
Society.2014: 675-679.
[16] 邓宏艳,孔纪名,王成华.不同成因类型堰塞湖的应急处置措施比较[J].山地学报,2011,29(4):505-510.
DENG Hongyan,KONG Jiming, WANG Chenghua. The comparison of emergency treatment on dammed lakes caused by different
typesgeologic hazards[J]. Journal of Mountain Science, 2011,29(4):505-510.
[17] 杨启贵,李勤军.唐家山堰塞湖应急处置技术特点与体会[J].人民长江,2008,39(22):1-3.
YANG Qigui, LI Qinjun. Damage on earth-rock dams by Wenchuan earthquake and emergency handling[J]. Yangtze River,
2008,39(22): 1-3.
[18]徐富刚,杨兴国,周家文.堰塞坝漫顶破坏溃口演变机制及试验研究[J].重庆交通大学学报(自然科学版),2015,34(6):79- 83.
XU Fugang, YANG Xingguo, ZHOU Jiawen. Experimental study on dyke evolution mechanism in dam-break process of landslide dam
[J].Journal of Chongqing Jiaotong University(Natural Science), 2015, 34(6): 79-83.
[19] COLEMAN S E, ANDREWS D P, WEBBY M G.Overtopping breaching of non-cohesive homogeneous embankments[J]. Journal of
Hydraulic Engineering, 2002, 128(9):829-838.
[20] 何学仁.安县老鹰岩堰塞湖应急排险处置总结[C]// 纪念汶川地震一周年——抗震减灾专题学术讨论会论文集.北京:中国岩 石力
学与工程学会.2009:1019-1022.
HE Xuereng. The summary of emergency disposal for Laoyingyan landslide dam[C]// Commemoration of the First Anniversary
of Wenchuan Earthquake: Collected Papers of Symposium on Earthquake Resistance and Disaster Reduction. Beijing: Chinese
Society for Rock Mechanics and Engineering, 2009: 1019-1022.
[21] 刘放,张世殊,黄良文.小岗剑堰塞湖应急排险施工方案研究[C]// 纪念汶川地震一周年——抗震减灾专题学术讨论会论文集 .北
京:中国岩石力学与工程学会.2009:1033-1040.
LIU Fang, ZHANG Shishu, HUANG Liangwen. The investigation of emergency disposal for Xiaogangyan landslide dam[C]//
Commemoration of the First Anniversary of Wenchuan Earthquake: Collected Papers of Symposium on Earthquake Resistance and
Disaster Reduction. Beijing: Chinese Society for Rock Mechanics and Engineering. 2009: 1033-1040.
[22] 黄启平,周海慧,易玉平.云南鲁甸“8.03”地震红石岩堰塞湖应急处置的回顾与思考[J].大坝与安全,2014(5):1-5.
HUANG Qiping, ZHOU Haihui, YI Yuping. Review of the emergency treatment of Hongshiyan barrier lake induced bythe “8.03”
earthquake in Ludian county, Yunnan province[J]. Dam & Safety, 2014(5): 1-5.
[23] 王小东.土石坝漫顶溃决过程试验及模拟研究[D].南京:南京水利科学研究院,2010.
WANG Xiaodong. Study on Break Process Model Test due to Overtopping and Numerical Simulation for Earth-Rock Dams[D].
Nanjing: Nanjing Hydraulic Research Institute, 2010.
[24] 许乾奇.震后松散体转化泥石流成因机理探究——考虑坡度、流量、初始含水率的影响[D].成都:成都理工大学,2014.
XU Qianqi. Study on the Genesis Mechanism of Debris Flow Transformed by Loose Body after Earthquake: Considering the
Effect of Slope, Flow and Initial Water Content[D]. Chengdu: Chengdu University of Technology, 2014. |