[1] 钱建漳,周一桥.采用长线法和短线法预制预应力混凝土箱梁节段的比较[J].公路交通技术,2003(5):69-73.
QIAN Jianzhang, ZHOU Yiqiao. Comparison between prestressed concrete box beams prefabricated by long line or short lone methods[J].Technology of Highway and Transport, 2003(5): 69-73.
[2] 刘先鹏,刘亚东,戴书学,等.箱梁节段短线匹配法预制施工技术[J].重庆建筑大学学报,2006,28(5):59-62.
LIU Xianpeng, LIU Yadong, DAI Shuxue,et al. Short-line match casting technique for precast segmental construction[J]. Journal of Chongqing Jianzhu University, 2006, 28(5): 59-62.
[3] 张鸿,张喜刚,丁峰,等.短线匹配法节段预制拼装桥梁新技术研究[J].公路,2011(2):76-82.
ZHANG Hong, ZHANG Xigang, DING Feng, et al. Study of short-line match casting technique for precast segmental construction[J].Highway, 2011(2): 76-82.
[4] 陈彪.桥梁预制节段拼装施工技术发展概述[J].筑路机械与施工机械化,2014,31(3):31-36.
CHEN Biao. Overview of development of precast segment assembling technology for bridge[J].Road Machinery & Construction Mechanization, 2014, 31(3): 31-36.
[5] 王凯,胡可,段海澎.芜湖长江公路二桥引桥段上部结构设计与施工[J].公路交通技术,2017,33(3):47-51.
WANG Kai, HU Ke, DUAN Haipeng. Design and construction of upper structure of approach section of Wuhu Yangtze River expressway bridge No.2[J].Technology of Highway and Transport, 2017, 33(3): 47-51.
[6] 石雪飞,刘志权,胡可,等.全体外预应力节段预制拼装连续梁桥承载能力足尺模型试验[J].中国公路学报,2018,31(12):163-173.
SHI Xuefei, LIU Zhiquan, HU Ke, et al. Full-scale test of bearing capacity of a complete external prestressed segmental precast continuous girder bridge[J].China Journal of Highway and Transport, 2018, 31(12): 163-173.
[7] 马祖桥,陈艾荣,胡可.全体外预应力节段梁桥使用性能足尺模型试验[J].桥梁建设,2020,50(3):39-45.
MA Zuqiao, CHEN Airong, HU Ke. Full-scale model test on service performance of segmental girder bridges with full external prestressing[J].Bridge Construction, 2020, 50(3): 39-45.
[8] 周志祥.对“预弯梁及其正截面强度”的讨论[J].土木工程学报,1990,23(2):79-82.
ZHOU Zhixiang. Discussion on preflex beam and capacity of moment[J].China Civil Engineering Journal, 1990, 23(2): 79-82.
[9] 周志祥,江炳章.翼缘对预应力混凝土梁斜截面抗裂强度的影响[J].河海大学学报,1990,18(3):99-104.
ZHOU Zhixiang, JIANG Bingzhang. Influence of flanges on auti-cracking shear strength of inclined section of prestressed concrete beams[J].Journal of Hohai University, 1990, 18(3): 99-104.
[10] 周志祥,江炳章.无粘结部分预应力砼梁的斜截面抗裂能力[J].重庆交通学院学报,1991,10(2):1-5.
ZHOU Zhixiang, JIANG Bingzhang. Anti-cracking capacity of inclined section of partially prestressed concrete beams with unbonded tendons[J]. Journal of Chongqing Jiaotong Institute, 1991, 10(2): 1-5.
[11] 周志祥,江炳章.部分预应力混凝土梁在重复荷载下斜裂缝开展宽度的试验研究[J].重庆交通学院学报,1991,10(3):49-55.
ZHOU Zhixiang, JIANG Bingzhang. Experimental investigation of diagonal crack width for partially prestressed concrete beams under repeated loading[J].Journal of Chongqing Jiaotong Institute, 1991, 10(3): 49-55.
[12] 周志祥,江炳章.无粘结部分预应力砼梁弯曲裂缝研究[J].重庆交通学院学报,1992,11(3):21-27.
ZHOU Zhixiang, JIANG Bingzhang. A study of bending cracks in unbonded prestressed concrete beam[J].Journal of Chongqing Jiaotong Institute, 1992, 11(3): 21-27.
[13] 周志祥,江炳章.无粘结部分预应力砼梁抗剪强度[J].重庆交通学院学报,1994,13(5):23-30.
ZHOU Zhixiang, JIANG Bingzhang. Inquiry of shear strength of partially prestressed concrete beams with unbonded tendons[J]. Journal of Chongqing Jiaotong Institute, 1994, 13(5): 23-30.
[14] 住房城乡建设部.建筑节能与绿色建筑发展“十三五”规划[EB/OL].(2017-03-01)[2021-10-01].http:∥www.mohurd.gov.cn/wjfb/2017 03/t20170314_ 230978.html.
MOHURD.The 13th Five-Year Plan for Development of Building Energy Conservation and Green Building[EB/OL]. (2017-03-01)[2021-10-01]. http:∥www. mohurd.gov.cn/wjfb/201703/t20170
314_ 230978.html.
[15] 交通运输部.交通运输部关于推进公路钢结构桥梁建设的指导意见[EB/OL].(2016-07-13) [2021-10-01].http:∥www.gov.cn/xinwen/2016-07/13/ content_5090826.htm.
Ministry of Transport of the People’s Republic of China. Guidance on Promoting the Construction of Highway Steel Structure Bridges[EB/OL]. (2016-07-13) [2021-10 -01]. http:∥www.gov.cn/xin
wen/2016-07/13/ content_ 5090826.htm.
[16] 国务院.关于大力发展装配式建筑的指导意见[EB/OL].(2016-09-30)[2021-10-01].http:∥www.gov.cn/xinwen/2016-09/30/content_ 5114334. htm.
State Council of the PRC. Guidance on Vigorously Developing Prefabricated Buildings[EB/OL]. (2016-09-30)[2021-10-01]. http:∥www.gov.cn/xinwen/ 2016- 09/30/content_5114334.htm.
[17] 国务院.关于促进建筑业持续健康发展的意见[EB/OL].(2017-02-24)[2021-10-01].http:∥www.gov.cn/zhengce/content/2017-02/24/content_ 5170625. htm.
State Council of the PRC. Opinions on Promoting the Sustainable and Healthy Development of Building[EB/OL].(2017-02-24)[2021-10-01]. http:∥ www.gov.cn/ zhengce/content/2017-02/24/content_5170625. htm.
[18] BROZZETTI J. Design development of steel-concrete composite bridges in France[J].Journal of Constructional Steel Research, 2000, 55(1): 229-243.
[19] BERTHELLEMY J. Composite construction: Innovative solutions for road bridges[C]∥ Puentes Mixtos, Composite Bridges 3rd International Meeting. 2001.
[20] BERTHELLEMY J. French bridges experiences from prefabricated deck elements[C]∥Bridges Built with Prefabricated Elements. 2009.
[21] HLLMARK R, COLLIN P, STOLTZ A. Innovative prefabricated composite bridges[J]. Structural Engineering International, 2009, 19(1): 69-78.
[22] SHIM C S, CHANG S P. Cracking of continuous composite beams with precast decks[J].Journal of Constructional Steel Research, 2003, 59(2): 201-214.
[23] 朴泷,周高明,吴小兵,等.港珠澳大桥浅水区非通航孔桥钢-混组合梁施工技术[J].桥梁建设,2016,46(2):13-18.
PIAO Long, ZHOU Gaoming, WU Xiaobing, et al. Construction techniques for steel and concrete continuous composite girder of non-navigable span bridge of Hong Kong-Zhuhai-Macau bridge over shallow water Area[J].Bridge Construction, 2016, 46(2): 13-18.
[24] 郑清刚,张强,王东晖,等.港珠澳大桥九洲航道桥设计[J].桥梁建设,2021,51(4):103-110.
ZHENG Qinggang, ZHANG Qiang, WANG Donghui, et al. Design of Jiuzhou channel bridge of Hong Kong-Zhuhai-Macao bridge[J].Bridge Construction,2021, 51(4): 103-110.
[25] 朱淼,蔡晓辉.芜湖长江公铁大桥超大弦杆箱桁组合梁拼装工艺[J].中国高新科技,2020(13):121-122.
ZHU Miao, CAI Xiaohui. Technical assembly of steel-box-truss composite girder of Wuhu Yangze River rail-cum-road bridge[J].China High-Tech, 2020(13): 121-122.
[26] 谢凯桥.50 m跨新型装配式波形腹板钢板梁连续组合梁桥静动力分析研究[D].成都:西南交通大学,2017.
XIE Kaiqiao.Analysis of Static and Dynamic Performance of New Prefabricated Continuous Composite Beam Bridge with Corrugated Steel Webs of 50 m Span[D]. Chengdu: Southwest Jiaotong University, 2017.
[27] 刘玉擎.组合结构桥梁的发展与展望[C]∥ 2005年全国桥梁学术会议论文集.北京:人民交通出版社,2005.
LIU Yuqing. Development and prospect of composite structure bridges[C]∥Proceedings of 2005 National Bridge Academic Conference. Beijing: China Communications Press, 2005.
[28] SHIM C S, CHANG S P. Cracking of continuous composite beams with precast decks[J].Journal of Constructional Steel Research, 2003, 59(2): 201-214.
[29] ZHOU Zhixiang, FAN Liang, WANG Shaorui, et al. Chongqing Wan-sheng Zaodu bridge-steel box-concrete composite arch bridge[J].Structural Engineering International, 2013, 23(1): 71-74.
[30] GAO Yanmei, ZHOU Zhixiang, LIU Dong, et al. Cracking of a prefa-bricated steel truss-concrete composite beam with pre-embedded shear studs under hogging moment[J]. Steel and Composite Structures, 2016, 21(5): 981-997.
[31] XIANG Hong, ZHOU Zhixiang. Exploration of large-span steel box-concrete composite continuous rigid frame bridges[C]∥International Symposium on Bridge and Structural Engineering. 2010: 102-109.
[32] XIANG Hong, ZHOU Zhixiang, ZAI Guojun. Arch axis optimum de-sign of steel box-concrete composite arch bridge based on improved genetic algorithms[J]. IEEE, 2010.
[33] 〖JP3〗GAO Yanmei, ZHOU Zhixiang, LIU Dong, et al. Cracking of a pre-fabricated steel truss-concrete composite beam with pre-embedded shear studs under hogging moment[J]. Steel and Composite Structures, 2016, 21(5): 981-997.〖JP〗[34] 〖JP3〗XIANG Hong, ZHOU Zhixiang. Exploration of large-span steel box-con-crete composite continuous rigid frame bridges[C]∥International Symposium on Bridge and Structural Engineering. 2010: 102-109.〖JP〗[33] XIANG Hong, ZHOU Zhixiang, ZAI Guojun. Arch axis optimum de-sign of steel box-concrete composite arch bridge based on improved genetic algorithms[J]. IEEE, 2010.
[34] XIANG Hong, ZHOU Zhixiang, XU Yong. The finite element analysis of the large span steel truss arch bridge's node fatigue test[C]∥ International Conference on E-product E-service & E-entertainment. IEEE, 2010.
[35] 曾德子, 杨未蓬, 高燕梅, 等. 全装配式钢-混凝土组合构件抗剪性能试验研究[J].重庆交通大学学报(自然科学版),2018,37(12):45-50.
ZENG Dezi, YANG Weipeng, GAO Yanmei, et al. Experimental study on shearing resistance of fully assembled steel-concrete composite str-uctures[J]. Journal of Chongqing Jiaotong University(Natural Sci-ence), 2018, 37(12): 45-50.
[38] 穆健.高强螺栓连接节点疲劳破坏试验研究[D].重庆:重庆交通大学,2010.〖DW〗MU Jian. Research of the Fatigue Failure Test of Joint with High Strength Bolt [D]. Chongqing: Chongqing Jiaotong University, 2010.[36] 周志祥,王中文.PCSS剪力联结构造:ZL201310130786.4[P].2016-08-31.
ZHOU Zhixiang, WANG Zhongwen.Structure of PCSS Shear Connector: ZL201310130786.4[P]. 2016-08-31.
[37] 周志祥,周劲宇,乔心格.板梁整体装配式组合梁桥的PCSC剪力联结构造:ZL201711251329.5[P].2019-07-23.
ZHOU Zhixiang, ZHOU Jinyu, QIAO Xinge.Connecting Details of PCSC Shear Connector in Fully Assembly Composite Deck Bridges: ZL201711251329.5[P]. 2019-07-23.
[38] 李佳宣.装配式组合梁PCSC剪力联结承载机理研究[D].重庆:重庆交通大学,2020.
LI Jiaxuan. Study on The Bearing Mechanism of PCSC Shear Connec-tion Applied to the Assembled Composite Beam[D]. Chongqing: Chongqing Jiaotong University, 2020.
[39] 程叶青,张金萍,陈妍.资源禀赋、经济基础与海南自由贸易港建设[J].资源科学,2021,43(2):229-240.
CHEN Yeqing, ZHANG Jinping, CHEN Yan. Resource endowment, economical foundation, and the construction of Hainan free trade port[J].Resources Science, 2021, 43 (2): 229-240.
[40] 牛雪莲,陈昌平.海洋工程钢结构腐蚀防护的研究进展[J].船舶工程,2019,41(4):100-103.
NIU Xuelian, CHEN Changping. Research progress of corrosion protec-tion of steel structure in marine engineering[J].Ship Engineering, 2019, 41(4): 100-103.
[41] 欧阳志远,史作廷,石敏俊,等.“碳达峰碳中和”:挑战与对策[J].河北经贸大学学报,2021,42(5):1-11.
OUYANG Zhiyuan, SHI Zuoting, SHI Minjun, et al. Challenges and countermeasures of "Carbon Peak and Carbon Neutrality"[J]. Journal of Hebei University of Economics and Business, 2021, 42(5): 1-11.
[42] 来猛刚,杨敏,翟敏刚,等.桥梁工业化智能建造[J].公路,2021(7):195-202.
LAI Menggang, YANG Min, ZHAI Mingang. Industrialized intelligent construction of bridge[J].Highway, 2021(7): 195-202.
[43] 陶慕轩,聂建国,樊健生,等.中国土木结构工程科技2035发展趋势与路径研究[J].中国工程科学,2017,19(1):73-79.
TAO Muxuan, NIE Jianguo, FAN Jiansheng, et al. Development trends and path for China's civil and structural engineering science and technology to 2035[J].Strategic Study of CAE, 2017, 19(1): 73-79.
[44] 陈超,孙静.桥梁全寿命周期成本分析及应用[J].价值工程,2019,38(33):261-263.
CHEN Chao, SUN Jing. Bridge lifecycle cost analysis and application[J]. Value Engineering, 2019, 38(33): 261-263.
[45] 石雪飞,许琪.辽宁省中小跨径钢混组合结构桥梁全寿命周期成本分析[J].北方交通,2019(2):5-8.
SHI Xuefei, XU Qi. Life cycle cost analysis of short and medium span steel-concrete composite bridges in Liaoning Province[J].Northern Communications, 2019(2): 5-8.
[46] 高春艳,牛建广,王斐然.钢材生产阶段碳排放核算方法和碳排放因子研究综述[J].当代经济管理,2021,43(8):33-38.任静. 碳排放影响因素研究综述[J].资源与产业, 2015,17(1):79-83.
GAO Cunyan, NIU Jianguang, WANG Feiran. Review ofcarbon emission accounting methods and carbon emission factor in steel production[J]. Contemporary Economic Management, 2021, 43(8): 33-38.REN Jing. Reviews on carbon emission factors[J]. Resources & Industries, 2015, 17(1):79-83.
[47] 刘立涛,张艳,沈镭,等.水泥生产的碳排放因子研究进展[J].资源科学,2014,36(1):110-119.
LIU Litao, ZHANG Yan, SHEN Lei, et al. A review of cement Produc-tion carbon emission factors: Progress and prospects[J]. Resources Science, 2014, 36(1): 110-119.
[48] 周志祥,蒋金龙,邹杨,等.全装配式NHNR剪力连接的钢-砼组合梁:202111097445.2[P].2021-09-18.
ZHOU Zhixiang, JIANG Jinlong, ZOU Yang, et al. Fully Assembly Steel-Concrete Composite Bridges with NHNR Shear Connector: 202111097445.2[P]. 2021-09-18. |