[1]严自勉,顾斯照.缆索起重机[M].北京:中国电力出版社,2010.
YAN Zimian, GU Sizhao.Cable Crane[M].Beijing:China Electric Power Press,2010.
[2]杨寿忠.重庆鹅公岩悬索桥主梁索道吊装方案设计[J].市政技术,2005,23(5):285-287.
YANG Shouzhong. The conceptional design of main girder erection by cableway for Egongyan suspension bridge in Chongqing[J].Municipal Technology,2005,23(5):285-287.
[3]李德钦,包建武,鲜正洪,等.900m大跨径缆索吊验算及荷载试验[J].公路与汽运,2009(1):131-134.
LI Deqin,BAO Jianwu,XIAN Zhenghong. Long-span of 900 meters cable hoisting system calculation and load test[J].Roads and Trucks,2009(1):131-134.
[4]郭吉平.北盘江大桥缆吊系统及钢桁梁安装关键技术[J].世界桥梁,2011(6):22-25.
GUO Jiping. The key technologies of steel truss beam installation and cable crane system of beipangjiang bridge[J].World Bridges,2011(6):22-25.
[5]彭成明,陈富强,陈鸣.宁波明州大桥400 t缆索吊机设计与施工[J].中外公路,2011,31(5):167-170.
PENG Chengming,CHEN Fuqiang,CHEN Ming. The 400 t cable crane design and construction of Mingzhou bridge in Ningbo[J].Journal of China & Foreign Highway,2011,31(5):167-170.
[6]李宝东.缆索吊的设计安装及使用[J].公路,2005(10):73-77.
LI Baodong. The design and use of the cable hoisting system[J].Highway,2005(10):73-77.
[7]冉贸学,许红胜.山区大跨悬索桥施工缆索吊机的设计要点[J].中外公路,2009,29(4):101-104.
RAN Maoxue, XU Hongsheng.The cable crane’s key points of construction of long-span suspension bridge in mountain[J].Journal of China & Foreign Highway,2009,29(4):101-104.
[8]许红胜,颜东煌,冉贸学.桥梁施工缆索吊机承载索的设计研究[J].重庆交通大学学报(自然科学版),2009,28(5):837-839.
XU Hongsheng, YAN Donghuang, RAN Maoxue. Design of load-bearing cable of cable crane used in large-span bridge construction [J].Journal of Chongqing Jiaotong University(Natural Science),2009,28(5):837-839. |