[1] 洪开荣.我国隧道及地下工程发展现状及展望[J].隧道建设,2015,35(2):95-107.
HONG Kairong. State-of-art and prospect tunnels and underground works in China[J].Tunnel Construction, 2015, 35(2): 95-107.
[2] 何川,封坤,方勇.盾构法修建地铁隧道的技术现状及展望[J].西南交通大学学报,2015,50(1):97-109.
HE Chuan, FENG Kun, FANG Yong. Review and prospects on constructing technologies of metro tunnel using shield tunnelling method
[J].Journal of Southwest Jiaotong University, 2015, 50(1): 97-109.
[3] 张斌.全断面岩石掘进机刀具磨损研究及刀具布局优化[D].天津:天津大学,2013.
ZHANG Bin. Whole Section Rock Tunneler Tool Wear and Tool Layout Optimization[D].Tianjin: Tianjin University, 2013.
[4] 仲建华. 重庆轨道交通硬岩掘进技术(TBM)的应用研究[J]. 重庆交通大学学报(自然科学版), 2011, 30(增刊2):1197-1202.
ZHONG Jianhua. Application of TBM for hard rock construction in the rail construction of Chongqing[J].Journal of Chongqing Jiaotong
University(Natural Science),2011,30(Sup2):1197-1202.
[5] 刘小刚.TBM在岩石城市轨道交通建设中的应用研究[J].现代隧道技术,2012,49(5):15-21.
LIU Xiaogang. Application of TBM in rock urban rail transit construction[J].Modern Tunneling Technology, 2012, 49(5):15-21.
[6] 张志勇,关志鹏,陈小平,等.重庆轨道交通开敞式TBM施工问题及对策[J].隧道建设,2014,34(6):554-557.
ZHANG Zhiyong, GUAN Zhipeng, CHEN Xiaoping, et al. Problems and countermeasures in tunneling by open TBM in Chongqing rail transit
works[J].Tunnel Construction, 2014, 34(6): 554-557.
[7] 夏定光.豆砾石回填与灌浆技术探索[J].现代隧道技术,2002,39(1):20-24.
XIA Dingguang. Discussion on gravel backfilling and grouting[J].Modern Tunneling Technology, 2002, 39(1): 20-24.
[8] 郭惠川.基于单护盾的复合式TBM在城市轨道交通工程的应用与研究[D]. 石家庄:石家庄铁道大学,2015.
GUO Huichuan. Based on Single Complex of Shield TBM in Application and Research of Urban Rail Transit Projects[D].Shijiazhuang:
Shijiazhuang Tiedao University, 2015.
[9] 苏华友, 张继春. 引水隧洞豆砾石回填灌浆渗透系数的试验分析[C]// 第八次全国岩石力学与工程学术大会论文集.北京:科学出版社 , 2004.
SU Huayou, ZHANG Jichun. Test and analyse permeability coefficient of pea-gravel back-filling grouting in division water tunnel
[C]//Eighth National Rock Mechanics and Engineering Academic Conference Proceedings. Beijing: Science Press, 2004.
[10] 章跃林. TBM快速掘进隧洞设计和豆砾石回填灌浆新方法的应用[C]//2002年水利水电地基与基础工程学术会议论文集.大连: [s.n.],2002.
ZHANG Yuelin. Application of the new method of TBM rapid excavation tunnel design and bean gravel backfill grouting[C] //Proceedings
of 2002 Academic Conference on Foundation and Foundation Engineering of Water Conservancy and Hydropower. Dalian: [s.n.], 2002.
[11] 郭惠川.豆砾石回填灌浆工艺在复合式TBM施工中的应用[J].国防交通工程与技术,2013,11(4):52-54.
GUO Huichuan. Application of pea gravel backfill grouting technology in the construction of compound TBM[J].Traffic Engineering and
Technology for National Defense, 2013, 11(4): 52-54.
[12] 中交第一公路工程局有限公司.重庆TBM项目碎石吹填灌浆模拟试验报告[R].重庆:中交第一公路工程局有限公司,2015.
CCCC First Highway Engineering Co., Ltd.. Simulated Test Report of Gravel Filling Grouting in Chongqing TBM Project[R].Chongqing:
CCCC First Highway Engineering Co., Ltd., 2015.
[13] 杨延栋,陈馈,李凤远,等.全断面硬岩地层盾构隧道管片上浮控制技术研究[J].隧道建设,2015,35(2):180-184.
YANG Yandong, CHEN Kui, LI Fengyuan, et al. Control technologies for up-floating of segment rings of shield-bored tunnel in full-face
hard-rock ground[J].Tunnel Construction, 2015, 35(2): 180-184.
[14] 叶飞,毛家骅,纪明,等.盾构隧道壁后注浆研究现状及发展趋势[J].隧道建设,2015,35(8): 739-752.
YE Fei, MAO Jiahua, JI Ming, et al. Research status and development trend of back-filled grouting of shield tunnels[J].Tunnel
Construction, 2015, 35(8): 739-752.
[15] SHIRLAW J N, RICHARDS D P, RAMOND P, et al. Recent experience in automatic tail void grouting with soft ground tunnel boring
machines[J].Tunneling and Underground Space Technology, 2004, 19(4/5):446.
[16] MO H H,CHEN J S. Study on inner force and dislocation of segments caused by shield machine attitude[J].Tunneling and
Underground Space Technology, 2008, 23(3): 281-291. |