[1]龚清盛,朱家荣,张威.大跨度钢管混凝土拱桥施工控制技术研究[J].四川建筑,2010,30(5):207-208. GONG Qing-sheng,ZHU Jia-rong,ZHANG Wei.Research on theLarge-span steel arch bridge construction control technology[J].SiChuan Architectural,2010,30(5):207-208.
[2]陈宝春.钢管混凝土拱桥[M].2版.北京:人民交通出版社,2007.
[3]向中富.桥梁施工控制技术[M].北京:人民交通出版社,2001.
[4]周水兴,张永水,顾安邦,等.大跨钢管混凝土拱桥施工控制的理论与实践[J].重庆交通学院学报,2001,20(3):14-16. ZHOU Shui-xing,ZHANG Yong-shui,GU An-bang,et al.Thetheory and practice for construction control in large CFST archbridges[J].Journal of Chongqing Jiaotong University,2001,20(3):14-16.
[5]王亚超,张晋.钢管混凝土拱桥施工控制关键技术研究[J].城市道路与防洪,2009(7):222-224. WANG Ya-chao,ZHANG Jin.Study of key construction controltechnique of steel pipe concrete arched bridge[J].Urban RoadsBridges&Flood Control,2009(7):222-224.
[6]张敏,周水兴,胡免缢.钢管混凝土拱桥施工控制原理与控制分析算法研究[J].公路交通科技,2003,20(2):39-42. ZHANG Min,ZHOU Shui-xing,HU Mian-yi.Study on construc-tion control principle and arithmetic of CFST arch bridge[J].Jour-nal of Highway and Transportation Research and Development,2003,20(2):39-42.
[7]李明光.钢管混凝土拱桥施工控制研究[J].辽宁省交通高等专科学校学报,2008,10(1):4-6. LI Ming-guang.Research of ningbo cicheng bridge constructioncontrol[J].Journal of Liaoning Provincial College of Communica-tions,2008,10(1):4-6.
[8]肖军良.大跨度钢管混凝土拱桥施工方法的研究[D].重庆:重庆交通学院,2003.
[9]赵洋,周水兴,刘静.钢管混凝土拱桥拱肋吊装线形控制的分步算法[J].重庆交通大学学报:自然科学版,2010,29(1):1-3. ZHAO Yang,ZHOU Shui-xing,LIU Jing.Step-by-step algorithm ofliner control of arch ribs of CFST arch bridges[J].Journal ofChongqing Jiaotong University:Natural Science,2010,29(1):1-3.
|