[1] 李国英,苗喆,米占宽. 深厚覆盖层上高面板坝建基条件及防渗设计综述[J]. 水利水运工程学报, 2014 (4): 1-6.
LI Guoying, MIAO Zhe, MI Zhankuan. A review of foundation condition and design scheme for seepage prevention system of high CFRD built
on deep alluvium deposit[J].Hydro-Science and Engineering, 2014 (4): 1-6.
[2] 韩国城,栾茂田,刘文廷,等. 瀑布沟心墙堆石坝地震反应三维非线性分析[J]. 大连理工大学学报, 2000, 40(2): 218-223.
HAN Guocheng, LUAN Maotian, LIU Wenting, et al. Three dimensional nonlinear analysis of seismic response of Pubugou cored rockfill dam
[J].Journal of Dalian University of Technology, 2000, 40(2): 218-223.
[3] 李立刚. 小浪底水利枢纽大坝变形特性及成因分析[J]. 水利水电科技进展, 2009, 29(4): 39-43.
LI Ligang. Analysis of properties and causes of deformation of the Xiaolangdi Hydro Project dam[J].Advances in Science and
Technology of Water Resources, 2009, 29(4): 39-43.
[4] 李同春,刘晓青,夏颂佑,等. 冶勒堆石坝沥青混凝土心墙型式及尺寸研究[J]. 河海大学学报(自然科学版), 2000, 28(2): 109-112.
LI Tongchun, LIU Xiaoqing, XIA Songyou, et al. Study on asphalt concrete core type and size of Yele Rockfill Dam[J].Journal of Hohai
University, 2000, 28(2): 109-112.
[5] 黄黎冰. 水闸闸室结构与地基力学作用机理数值分析[D]. 成都: 四川大学, 2006.
HUANG Libin. The Numerical Analysis of Mechanical Behavior of Sluice Structure and Foundation[D].Chengdu: Sichuan University, 2006.
[6] 贾冬. 厚覆盖层上的水闸三维有限元静力分析和动力响应分析研究[D]. 南京: 河海大学, 2005.
JIA Dong. Static and Dynamic Analysis of the Sluice of Jin Ping Ca scade 2 Hydroelectric Power Station’ Sluice was Studied Using the
Finite Element Method[D].Nanjing: Hohai University, 2005.
[7] 沈婷,李国英,李云,等. 覆盖层上面板堆石坝趾板与基础连接方式的研究[J]. 岩石力学与工程学报, 2005, 24(14): 2588-2592.
SHEN Ting, LI Guoying, LI Yun, et al. Numerical analysis of joint types between toe slab and foundation of CFRD in alluvial deposit
layer[J].Chinese Journal of Rock Mechanics and Engineering, 2005, 24(14): 2588-2592.
[8] 郭兴文,王德信,蔡新. 覆盖层地基上混凝土面板堆石坝优化设计研究[J]. 河海大学学报, 1998, 26(4): 54-59.
GUO Xingwen, WANG Dexin, CAI Xin. Study on optimal design of CFRD on alluvial deposit[J].Journal of Hohai University, 1998, 26(4):
54-59.
[9] 刘世煌. 试谈覆盖层上水工建筑物的安全评价[J]. 大坝与安全, 2015 (1): 46-63.
LIU Shihuang. Safety assessment of hydraulic structures built on overburden layer[J].Large Dam & Safety, 2015 (1): 46-63.
[10] 李荣彬. 不同覆盖层厚度对土石坝动力响应的影响[J].人民黄河, 2012, 34(3): 109-111.
LI Rongbin. Effects of different mantle layer thickness to the dynamic response of earth-rock dam[J].Yellow River, 2012, 34(3): 109
-111.
[11] DESAI C S, ZAMAN M M, LIGHTNER J G , et al. Thin layer element for interface and joints[J].International Journal for
Numerical & Analytical Methods in Geomechanics, 1984 , 8(1):19-43. |