[1] 竺维彬, 鞠世建. 地铁盾构施工风险源及典型事故分析的研究[M]. 广州: 暨南大学出版社, 2009:78-86.
ZHU Weibin, JU Shijian.Research on Risk Sources and Typical Accidents in Tunneling Construction[M]. Guangzhou: Jinan
University Press, 2009: 78-86.
[2] ANAGNOSTOU G, KOVáRI K. Face stability conditions with earth-pressure-balanced shields[J]. Tunnelling and
Underground Space Technology, 1996, 11(2):165-173.
[3] 秦建设. 盾构施工开挖面变形与破坏机理研究[D]. 南京: 河海大学, 2005.
QIN Jianshe. Study on Faee Deformation and Collapse of Earth Pressure Shield Tunnel[D]. Nanjing: Hohai University, 2005.
[4] 魏纲, 贺峰. 砂性土中顶管开挖面最小支护压力的计算[J]. 地下空间与工程学报, 2007, 3(5): 903-908.
WEI Gang, HE Feng. Calculation of minimal support pressure acting on shield face during pipe jacking in sandy soil[J].
Chinese Journal of Underground Space and Engineering, 2007, 3(5): 903-908.
[5] ANAGNOSTOU G. The contribution of horizontal arching to tunnel face stability[J]. Geotechnik, 2012, 35(1):34-44.
[6] CHEN R P, TANG L J, YIN X S. An improved 3d wedge-prism model for the face stability analysis of the shield tunnel
in cohesionless soils[J]. Acta Geotechnica, 2015, 10(5): 683-692.
[7] LECA E, DORMIEUX L. Upper and lower bound solutions for the face stability of shallow circular tunnels in frictional
material = Limites supérieures et inférieures pour la stabilité du front de tunnels circulaires peu profonds, dans un maté
riau frottant[J]. Geotechnique, 1990,40(4):581-606.
[8] MOLLON G, DIAS D, SOUBRA A H. Face stability analysis of circular tunnels driven by a pressurized shield[J].
Journal of Geotechnical and Geoenvironmental Engineering, 2010, 136(1): 215-229.
[9] 吕玺琳, 王浩然, 黄茂松. 盾构隧道开挖面稳定极限理论研究[J]. 岩土工程学报, 2011, 31(1): 57-62.
LV Xilin, WANG Haoran, HUANG Maosong. Limit theoretical study on face stability of shield tunnels[J]. Chinese Journal of
Geotechnical Engineering,2011,31(1):57-62.
[10] KIRSCH A. Experimental investigation of face stability of shallow tunnels in sand[J]. Acta Geotechnica, 2010, 5
(1): 43-62.
[11] CHENABAA R P. Experimental study on face instability of shield tunnel in sand[J]. Tunnelling & Underground Space
Technology Incorporating Trenchless Technology Research, 2013, 33(1):12-21.
[12] IDINGER G, AKLIK P, WU W, et al. Centrifuge model test on the face stability of shallow tunnel[J]. Acta
Geotechnica, 2011, 6(2): 105-117.
[13] CASAGRANDE A. Shear failure of anisotropic materials[J]. Journal of the Boston Society of Civil
Engineers,1944,31(4):74-87.
[14] LO K Y. Stability of slopes in anisotropic soils[J]. Journal of the Soil Mechanics and Foundations
Division,2014,91(4):85-106.
[15] Al-KARNI A A, Al-SHAMRANI M A. Study of the effect of soil anisotropy on slope stability using method of slices[J
]. Computers and Geotechnics, 2000, 26(2): 83-103.
[16] 黄茂松, 于胜兵, 秦会来. 基于上限法的K0固结黏土基坑抗隆起稳定分析[J]. 土木工程学报, 2011, 44(3): 101-108.
HUANG Maosong, YU Shengbing, QIN Huilai. Upper bound method for basal stability analysis of braced excavations in K0-
consolidated clays[J]. Chinese Civil Engineering Journal, 2011, 44(3): 101-108.
[17] Reddy A S, Rao K N V. Bearing capacity of strip footing on anisotropic and nonhomogeneous clay[J]. Soils &
Foundations, 2008, 21(1):1-6.
[18] 吕玺琳, 王浩然. 软土盾构隧道开挖面支护压力极限上限解[J]. 土木建筑与环境工程, 2011, 33(2): 65-69.
LV Xilin, WANG Haoran. Upper bound solution of the Limit support pressure during shield tunneling in soft clay[J].
Journal of Civil Architectural and Environmental Engineering,2011,33(2):65-69.
[19] PAN Q, DIAS D. Face Stability Analysis for a shield-driven tunnel in anisotropic and nonhomogeneous soils by the
kinematical approach[J]. International Journal of Geomechanics, 2015, 16(3):04015076. |