中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 1994, Vol. 13 ›› Issue (S1): 113-117.

Previous Articles     Next Articles

Float Analysis and Utilization of Network Plan for Engineering Construction

Wei Daosheng   

  1. Dept.of Management Engineering
  • Received:1994-09-16 Revised:1994-09-16 Online:1994-08-05 Published:2015-04-15

工程施工网络计划的时差分析与利用

魏道昇   

  1. 重庆交通学院管理系
  • 作者简介:魏道昇,男,39岁,讲师

Abstract: The activity float of network plan in a engineering cons-truction is the time kept in reverse for uti~lization of activity.There are some relations among the total float,the free float and the independentfloat.Studing their relations could help us in making and adjusting the plan and in controling theplanned engineering speed,and we can thus get much more in social and economical benefit.

Key words: network plan, float, utilization of float

摘要: 工程施工网络计划中的工序时差是工序可利用的机动时间,总时差与自由时差以及独立时差之间存在着内在的联系,研究它们之间的关系有助于我们进行计划的编制。调整以及在施工中对工程进度的控制,从而获得更大的社会效益与经济效益。

关键词: 网络计划, 时差, 时差利用

CLC Number: