HU Sheng-min , LUO Li-feng. Repair and construction of the old bridge deck overlays[J]. Journal of Chongqing Jiaotong University(Natural Science), 2002, 21(3): 17-20.
[1]吕继尚,黄建庭。广东4000 桥梁承受力不足急需加
固。广州日报,2000-11-29 (A4)。
[2]Norbert Joseph Delatte,Jr 。,B。S 。C 。E。,M 。S。C。
E。High Early Strength Bonded Concrete Overlay Designs
and Construction Methods For Rehabilitation of Crcp [D]。
The University of Texas at Austin,May 1996:176-177。
[3]黄成造,罗立峰,周建春。水泥砼桥面铺装施工方
法的研究[J]。公路交通技术,2001,(1):13-16