Journal of Chongqing Jiaotong University(Natural Science) ›› 2005, Vol. 24 ›› Issue (2): 12-17.

Previous Articles     Next Articles

Study on construction control technique in the process of replacing suspender of CFST arch bridge

CHEN Si-dan, WANG Jing, GONG Shang-long   

  1. CHEN Si-tian,WANG Jing,GONG Shang-long (Chongqing Jiaotong University, Chongqing 400074, China
  • Received:2004-04-19 Revised:2004-06-18 Online:2005-04-15 Published:2015-05-18

钢管砼拱桥吊杆更换施工控制技术

陈思甜,王静,龚尚龙   

  1. 重庆交通学院,重庆400074
  • 作者简介:陈思甜(1963一),男,四川宣汉人,副教授,主要从事桥梁监控、结构分析等研究工作.

Abstract: The construction control technique in the process of replacing suspender of CFST arch bridge is introduced in this paper. The technique was worked out according to simulation result from a program named MSC.Marc2001. And the technique has been applied to the project of Dadu-he bridge which in Le-shan city,Sichuan.

Key words: CFST arch bridge, replacing suspender, construction control

摘要: 以乐山市沙湾大渡河大桥的维修加固为依托工程,采用MS(2.Ma.w_21XI1高精度非线性分析软件对吊杆更换 过程进行仿真分析,制定出相应的施工控制方法,其成功经验对类似的维修加固工程有参考价值

关键词: 钢管砼拱桥, 吊杆更换, 施工控制