Journal of Chongqing Jiaotong University(Natural Science) ›› 2005, Vol. 24 ›› Issue (2): 38-41.
Previous Articles Next Articles
XU Lin—sheng
Received:
Revised:
Online:
Published:
徐林生
作者简介:
Abstract: Summarizing some multiple-arch tunnels which were constructed in recent years in our country. Elaborating several design and construction climacteric technology about the section shape and size, the measure of projects, the method of construction, the stability of surrounding rock, the dynamic control of construction, waterproof and drain etc
Key words: multiple-arch tunnel, design and construction, climacteric technology
摘要: 结合近年来我国修建的连拱隧道实例,对该类隧道断面形状与尺寸、工程措施、施工方法、围岩稳定性与动态 施工控制和防排水等设计、施工关键技术问题作了较为详细的综述
关键词: 连拱隧道, 设计与施工, 关键技术
CLC Number:
U451
XU Lin—sheng. Summarization of several climacteric technology about multiple-arch tunnel[J]. Journal of Chongqing Jiaotong University(Natural Science), 2005, 24(2): 38-41.
徐林生. 连拱隧道建设的若干关键技术问题综述[J]. 重庆交通大学学报(自然科学版), 2005, 24(2): 38-41.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://xbzk.cqjtu.edu.cn/EN/
http://xbzk.cqjtu.edu.cn/EN/Y2005/V24/I2/38