Journal of Chongqing Jiaotong University(Natural Science) ›› 2005, Vol. 24 ›› Issue (2): 73-75.
Previous Articles Next Articles
xu Ji—jia1 , ZHONG Yi—ming1 , GUO Chun一Lin2
Received:
Online:
Published:
徐积江1,钟以明2,郭春林2
作者简介:
Abstract: Roads in mountainous aro.Ak2 have varied topography,thus culverts have tO be frequently modified due to the position ,base and numbers,While culverts project bills are calculated based on culvert meters according to“"I'ne National Bids Docleme Model for Road Projects”,which brings about s0Ine inconvenience,t.,~qen disputes.The authors ofthis artlde have presented such methods as adding to model bill projects that helps solve similar modification problems efectively
Key words: roads in mountainous areas, culvert modifications, problems, tactics
摘要: 山区公路地形复杂,涵洞因位置、台基台身、基底处理和洞lZ:l数量变化较大使涵洞经常引起较大变更,而《公 路工程国内招标文件范本》(以下简称范本)涵洞项目工程量清单只按涵长米计价,给工程变更带来一定的不便,甚 至引起争议.作者提出在范本清单项目号后加小节等办法,为解决类似变更问题,找到了有效途径.
关键词: 山区公路, 涵洞变更, 问题, 对策
CLC Number:
U449.8
xu Ji—jia , ZHONG Yi—ming , GUO Chun一Lin. Problems and tactics for the culvert modifications of roads in mountainous areas[J]. Journal of Chongqing Jiaotong University(Natural Science), 2005, 24(2): 73-75.
徐积江,钟以明,郭春林. 山区公路涵洞变更存在的问题与对策[J]. 重庆交通大学学报(自然科学版), 2005, 24(2): 73-75.