Journal of Chongqing Jiaotong University(Natural Science) ›› 2007, Vol. 26 ›› Issue (增刊1): 136-137.
Previous Articles Next Articles
LI Wei 1,LIU Ling2
Received:
Revised:
Online:
Published:
李伟1,刘玲2
作者简介:
Abstract: Based on the experence of Caissons precasting with slip—form technique in a wharf project,the formwork,reinforcement work and concrete project ale summarized.Meanwhile,the construction technical requirement and points for attention of slip-form technique are proposed.
Key words: eassions, sllp—form , construction techn ique
摘要: 结合某新建码头工程采用滑模工艺预制沉箱的实际情况,对沉箱滑模预制的滑升模板、钢筋工程及砼工程的 施工技术进行探讨,对在气囊出运沉箱方案时如何考虑底模进行了详细介绍,并提出沉箱滑模预制施工质量保证措 施与施工过程中需注意的事项.
关键词: 沉箱, 滑模, 施工技术
CLC Number:
TU753.61
LI Wei ,LIU Ling. Summarization of the Construction Schemes of Caissons Precasting with Slip-ForMTechnique[J]. Journal of Chongqing Jiaotong University(Natural Science), 2007, 26(增刊1): 136-137.
李伟,刘玲. 采用滑模工艺预制沉箱施工技术综述[J]. 重庆交通大学学报(自然科学版), 2007, 26(增刊1): 136-137.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://xbzk.cqjtu.edu.cn/EN/
http://xbzk.cqjtu.edu.cn/EN/Y2007/V26/I增刊1/136