Journal of Chongqing Jiaotong University(Natural Science) ›› 2007, Vol. 26 ›› Issue (2): 97-100.
Previous Articles Next Articles
WANG Chun-mei1;HU Ji-1ong 2;HOU Yan-feng3
Received:
Revised:
Online:
Published:
王春梅1,胡继龙2,侯岩峰3
作者简介:
Abstract: The soil and rock aggregate mixture embankment,filled with the mudstone,sandstone and shale which are commort in Chongqing.is expounded as the research elements.The test ascertains the tamping parameter and standard of re-dynalnic compaction after heavy tamping.SO as to instruct the construction of Chongqing Yu-Lin Expressway and achieve the expected results.
Key words: soil an d rock aggregate mixture embankment, settlement of subgrade, re.dynam ic compaction, compaction treat. ra~nt
摘要: 以重庆渝邻高速公路常见的泥岩、砂岩和页岩土石混填路堤为研究对象,通过强夯试验研究确定强夯再压实 的夯击参数及质量控制标准,用以指导渝邻路高填方路堤的施工并达到预期加固效果.
关键词: 土石混填路堤, 路基沉降, 强夯再压实, 加固处治
CLC Number:
U416.1+2
WANG Chun-mei;HU Ji-1ong;HOU Yan-feng. Application of Re-dynamic Compaction Technique to High Embankment of Yu-Lin Expressway[J]. Journal of Chongqing Jiaotong University(Natural Science), 2007, 26(2): 97-100.
王春梅,胡继龙,侯岩峰. 强夯再压实技术在渝邻路高填方路堤中的应用[J]. 重庆交通大学学报(自然科学版), 2007, 26(2): 97-100.