| [1] |
CHEN Huawei1, SHAO Yiming1, 2, XU Jin1, 2, AO Guchang1,2, ZHANG Huiling1,2.
Off-Ramp Lane-Changing Timing Decision Making for
Intelligent Connected Vehicle Platoons on Freeways Based on
the Number of Fitted Gaps
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2026, 45(3): 81-89.
|
| [2] |
WANG Zhanyu1, SHEN Yamin1, DU Xuejing1, LIANG Wenzhi1, HU Yan2.
Distribution Feature Model of Debris in Side Impact of
Smart Tracking Vehicle
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2022, 41(05): 43-50.
|
| [3] |
DING Baiqun1, YANG Liu1, XU He2, LUO Lizhen3.
Multi-parameter Coordinated Control Method for Intersections with
Large Capacity Gaps
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2022, 41(04): 19-26.
|
| [4] |
FU Chenghong1, GAO Liangpeng1, ZHONG Ying2, XIE Libin2, TU Rui2.
Capacity Evaluation and Application in Urban Expressway Tunnel
Section under Lane-Reduction Condition
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2022, 41(02): 52-57.
|
| [5] |
WANG Wei1, 2, WU Yi1, ZHAO Yang1, QU Weidong1.
Dispatching Method of Expressway Emergency Resources under
Construction Environment
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2019, 38(02): 102-108.
|
| [6] |
NI Zhihui ,GUO Yi,WU Lichun.
Numerical Model of Channel Regulation for Bazinao Shoal Group
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2016, 35(2): 70-74.
|
| [7] |
BI Fangquan.
Sediment Numerical Simulation of Changshou to Luoqi Reach in Fluctuating Backwater Area of Three Gorges Project
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2016, 35(2): 64-69.
|
| [8] |
Li Wenjie, Wang Jie, Zhang Shuaishuai.
Study on One-Dimensional Mathematical Model of Slope Erosion
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2015, 34(1): 72-77.
|
| [9] |
He Yang,Yang Shengfa,Zhang Shuaishuai,Wu Guomao.
Effect of Changjiang Chongqing Dashaba Sand Excavation on Channel
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2013, 32(1): 152-156.
|
| [10] |
Luo Hong.
Changes of Channel Flow Conditions of Fuling-Changshou Reach
at Initial Period of Three Gorges Reservoir Impoundment
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2013, 32(1): 147-151.
|
| [11] |
HU Peng,YANG Sheng-fa,HU Jiang.
Analysis of Water Surface Calculation of the Three Gorges Reservoir in
175 m Initial Operation
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2011, 30(5): 1013-1017.
|
| [12] |
JIN Rui, ZHANG Xu-jin, PENG Yong-qin.
Numerical Simulation and Analysis of Flood Assessment of the Qingbaijiang Railway Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2010, 29(4): 510-513.
|
| [13] |
LIU Ya-hui, JIN Rui.
Numerical?Simulation?of?Navigable?Water?Conditions?at?the?Transshipment??Terminal?of?Xiangjiaba
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2009, 28(6): 1107-1111.
|
| [14] |
LIU Ren-wen.
Queuing?Model?for?U-Turn?Mouth?of?Bi-directional?Streets
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2009, 28(5): 921-925.
|
| [15] |
MEI Gai-wei, ZHANG Min, ZHOU Shui-xing.
Solution on Cable Force and Segmental Camber in Arch Bridge Construction by Modified Inverted Method
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2009, 28(2): 199-202.
|