[1] 张建民,郑皆连,秦荣.南宁永和大桥双重非线性稳定分析[J].公路交通科技,2002,19(3):58-62.
[2] 崔军,王景波,孙炳楠.大跨度钢管混凝土拱桥非线性稳定分析[J].哈尔滨工业大学学报,2003,35(7):876-878.
[3] Wang J,Zhang M Zh,Guo X L.Nonlinear stability analysis onthe concrete casting step of long-span concrete-filled steel tubearch bridge[J].Materials Science Forum,2009,6(14):275-282.
[4] Xie X,Chen HZh,Song Sh R,et al.Numerical analysis of ulti-mate strength of concrete filled steel tubular arch bridges[J].Journal of Zhejiang University Science,2005,6(8):859-868.
[5] Zhang Zh Ch,Xie X,Zhang H,et al.Approach for analyzing theultimate strength of concrete filled steel tubular arch bridges withstiffening girder[J].Journal of Zhejiang University Science,2007,8(5):682-692.
[6] Zhao HQ,Xu L,Yang HL,et al.Stability analysis of long-spandeck-type CFSTarch bridges[J].Journal of Highway and Trans-portation Research and Development,2007,2(1):62-65.
[7] 李国豪.桥梁结构稳定与振动[M].北京:中国铁道出版社,1996.
[8] 钟善桐.钢管混凝土结构[M].北京:清华大学出版社,2003.
[9] Spaconc A M E,Ei-tawil S.Nonlinear analysis of steal-concretecomposite structures:State of the art[J].Journal of Structure En-gineering,2004,130(2):159-168.