中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 2010, Vol. 29 ›› Issue (6): 871-874.

Previous Articles     Next Articles

Calculation and Analysis of the Ship Collision Force in Jiangjin Zhongdu Yangtze River Bridge

WEN Cen1,ZHAO Hai-yan1,ZHANG Yan-zhi2   

  1. 1.Southwest Water Transport Engineering Institute,Chongqing Jiaotong University,Chongqing 40074,China; 2.Suzhou City Traffic Design Institute Co.,Ltd.,Suzhou 215007,Jiangsu,China
  • Received:2010-09-16 Revised:2010-10-20 Online:2010-12-15 Published:2015-01-22

江津中渡长江大桥船桥碰撞力的计算和分析

文岑1,赵海艳1,张艳芝2   

  1. 1.重庆交通大学西南水运工程研究所,重庆 400074; 2.苏州市交通设计研究院有限责任公司,江苏 苏州 215007
  • 作者简介:文岑(1970—),男,四川富顺人,副研究员,主要从事港航研究。E-mail:zhy_320@126.com。

Abstract: Based on ship impact calculation of ready-built Jiangjin Zhougdu Yangtze River Bridge,the effect and selection of ship impact speed and impact angle were discussed in the paper. Code formula,empirical formula and finite element simulation method were employed to calculate the impact force of 3000-t ship and 5000-t ship. The results demonstrated that calculation results of road and railway code formula were small. The U. S. AASHTO formula,modified Worthing formula and finite element results were in agreement.

Key words: Jiangjin Zhougdu Yangtze River Bridge, ship, ship impact force, LS-DYNA program, impact

摘要: 结合拟建江津中渡长江大桥桥墩船撞力计算,对船舶撞击速度、角度的选取及影响进行了探讨;分别运用国 内外现行的规范公式、经验公式及有限元模拟方法,对3000t、5000t级船舶撞击桥墩的碰撞力进行了计算对比。 结果表明:我国现行公路和铁路规范公式计算结果偏小,美国AASHTO规范公式、修正沃辛公式与有限元计算结果 基本一致。

关键词: 江津中渡长江大桥, 船舶, 船撞力, LS-DYNA程序, 碰撞

CLC Number: