[1] 孙测世,童建胜,周水兴。曲线斜拉桥锚固点与支座偏移受力
影响[J]。重庆交通大学学报: 自然科学版,2009,28 (3): 492-
496.
Sun Ce-shi,Tong Jian-sheng,Zhou Shui-xing.Influence analysis on
anchorage and bearing offsets of curved cable-stayed bridge[J]。
Journal of Chongqing Jiaotong University: Natural Science,2009,
28(3): 492-496.
[2] 彭霞,王行耐。钢锚箱式索梁锚固区段有限元仿真分析[J]。公
路,2
009(9): 28-33.
Peng Xia,Wang Xing-nai.Finite element analysis of cable-girder
anchorage zone for cable-stayed bridge with steel anchor box[J]。
Highway,2009(9): 28-33.
[3] 李小珍,蔡婧,强士中。大跨度钢箱梁斜拉桥索梁锚固结构型
式的比较研究[J]。土木工程学报,2
004,3
7(3): 73-79.
Li Xiao-zhen,Cai Jing,Qiang Shi-zhong.Studies on models of cable-
girder anchorage for long-span cable-stayed bridges with steel
box girder[J]。China Civil Engineering,Journal,2004,37(3):
73-79.
[4] 邱建英。销轴锚固型式在桃夭门大桥上的应用[J]。公路,2
005
(12): 15-18.
Qiu Jian-ying.Application of pin-hinge connection on Tao Yaomen
Bridge[J]。Highway,2005(12): 15-18.
[5] 苏善根,许宏亮。斜拉桥销铰连接锚固形式的初探[J]。中国铁
道科学,2
003,2
4(1): 94-98.
Su Shan-gen,Xu Hong-liang.Cable-stayed bridge pin-hinge connection
anchorage[J]。China Railway Science,2003,24 (1): 94-
98.
[6] 朱劲松,肖如诚,曹一山。杭州湾跨海大桥索梁锚固节点模型
实验研究[J]。土木工程学报,2
007, 40(1): 49-59.
Zhu Jin-song,Xiao Ru-cheng,Cao Yi-shan.Model test on the cable
anchorage of the main girder of the Hangzhou Bay Bridge[J]。China
Civil Engineering Journal,2007,40(1): 49-59.
[7] 卫星,强士中。斜拉桥耳板式索梁锚固结构的空间分析[J]。中
国铁道科学,2
004, 25(5): 67-71.
Wei Xing,Qiang Shi-zhong.3D analysis on anchorage zone between
beam andcable in cable-stayed bridge[J]。China Railway
Science,2004,25(5): 67-71.
[8] 王勇,金卫兵,徐立功,等。灌河斜拉桥锚拉板结构分析[J]。现
代交通技术,2
004(1): 32-35.
Wang Yong,Jin Wei-bing,Xu Li-gong,et al.Analyze on Guanhe
cable-stayed bridge anchor plate structure[J]。Modern Transportation
Technology,2004(1): 32-35.
[9] 侯文琦,叶梅新。结合梁斜拉桥锚拉板结构研究[J]。钢结构,
2002, 17(2): 23-27.
Hou Wen-qi,Ye Mei-xin.Study of tensile anchor plate structure of
composite cable-stayed bridges[J]。Steel Structures,2002,17
(2): 23-27. |