中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 2010, Vol. 29 ›› Issue (1): 11-15.

Previous Articles     Next Articles

Engineering Diseases Analysis of Pre-stressed Sheet-pile Wall and Regulation Measures

CHEN Hua1,2,ZHAO You-ming1,ZHANG Fa-chun2   

  1. 1.Chinese Academy of Railway Sciences,Railway Engineering Research Institute,Beijing 100081,China; 2.Yunnan Provincial Plan,Design & Research Institute of Communications,Yunnan Kunming 650011,China
  • Received:2009-09-01 Revised:2009-10-20 Online:2010-02-15 Published:2015-01-22

预应力锚索桩板墙工程病害分析及整治措施

陈华1,2,赵有明1,张发春2   

  1. 1.中国铁道科学研究院铁道建筑研究所,北京 100081;2.云南省交通规划设计研究院,云南 昆明 650011
  • 作者简介:陈华(1973—),男,云南昭通人,博士研究生,主要从事边坡稳定和支挡结构方面的工作。E-mail:kjcchenhua@126.com。
  • 基金资助:
    交通运输部西部交通建设科技项目(2003-318-799-17)

Abstract: The engineering diseases characteristics of the pre-stressed sheet-pile wall are summed up,which includes the partial damage,connector damage and whole damage. The partial damage is the most popular disease,which can be further divided into anchor cable damage,pile damage,shield damage and damage of rock-solid embedded. The main causes of each damage form are analyzed and the regulation measures for each kind of damage are given,which could be referenced for the design and construction of similar engineering in the future.

Key words: pre-stressed sheet-pile wall, eengineering diseases, regulation measures

摘要: 总结了预应力锚索桩板墙结构物的病害特征,归纳出锚索桩板墙的病害类型主要有局部破坏、连接体破坏和 整体破坏。其中局部破坏是最常见的病害现象,进一步将其细分为锚索破坏、桩体破坏和板破坏、嵌固段岩体破 坏。分析了每种破坏形式的主要破坏原因,并针对每种破坏状态,提出了相应的整治措施,以供类似工程的设计和 施工提供参考。

关键词: 预应力锚索桩板墙, 工程病害, 整治措施

CLC Number: