Journal of Chongqing Jiaotong University(Natural Science) ›› 2010, Vol. 29 ›› Issue (1): 16-19.
Previous Articles Next Articles
ZHOU Jian-ting,DENG Zhi,YUAN Rui,LAN Yong,CHEN Qi
Received:
Revised:
Online:
Published:
周建庭,邓智,袁瑞,蓝勇,陈琦
作者简介:
基金资助:
Abstract: Basing on the analysis of additional internal forces influencing the long-span stone arch bridge with deteriorated arch axis,spandrel construction is adjusted in steps and segments by the influence line loading method. The adjusting load process is verified by Midas /Civil structure software,and the reasonable adjusting load process of spandrel construction for long-span stone arch bridge with deteriorated arch axis is proposed. In light of engineering practice,it is showed that the adjusting load process proposed is reasonable and feasible.
Key words: stone arch bridge, adjusting load, arch axis, spandrel construction, additional internal force
摘要: 在分析附加内力对劣化拱轴线大跨度石拱桥内力影响的基础上,运用影响线加载法对拱上建筑进行分节段 分步骤调整,通过Midas/Civil结构软件对调载工序进行验证,提出劣化拱轴线大跨度石拱桥拱上建筑合理调载工 序。工程实践应用表明,所提出的劣化拱轴线大跨石拱桥拱上建筑调载工序是合理的、可行的。
关键词: 石拱桥, 调载工序, 拱轴线, 拱上建筑, 附加内力
CLC Number:
U445.71
ZHOU Jian-ting,DENG Zhi,YUAN Rui,LAN Yong,CHEN Qi. Adjusting Load Process of Spandrel Construction for Large-Span Stone Arch Bridge with Deteriorated Arch Axis[J]. Journal of Chongqing Jiaotong University(Natural Science), 2010, 29(1): 16-19.
周建庭,邓智,袁瑞,蓝勇,陈琦. 劣化拱轴线大跨石拱桥拱上建筑调载工序研究[J]. 重庆交通大学学报(自然科学版), 2010, 29(1): 16-19.