Li Liqiang,Yang Shengfa,Liu Teng. Optimum Design Model Test of Curving Spillway of Zhongzuipo Hydropower[J]. Journal of Chongqing Jiaotong University(Natural Science), 2013, 32(1): 164-168.
[1]刘建,钱世波,张洋荣,等.重庆巫溪县刘家沟水电站工程初步
设计报告[R].重庆: 重庆三峡水电建筑勘察设计研究院,
2008.
Liu Jian,Qian Shibo,Zhang Yangrong,et al.Chongqing WuXi
Liujiagou Hydropower Project Preliminary Design Report [R].
Chongqing: Chongqing Three Gorges Hydropower Construction Survey
and Design Institute,2008.
[2]胡鹏,胡江.中咀坡水电工程溢洪道水工模型试验研究[J].重
庆交通大学学报: 自然科学版,2
010,2
9( 5) : 813-815.
Hu Peng,Hu Jiang.Hydraulic model test of spillway in Zhongzuipo
hydroelectric power projects[J].Journal of Chongqing Jiaotong
University: Natural Science,2010,29( 5) : 813-815.
[3]DL /T 5166—2002 溢洪道设计规范[S].北京: 中国电力出版
社,2
002.
DL /T 5166—2002 Spillway Design Code [S].Beijing: China
Power Press,2002.
[4]王建平,何贞俊,刘良军.大隆水利枢纽溢洪道优化水工模型试
验研究[J].华北水利水电学院学报,2009,30( 3) : 25-28.
Wang Jianping,He Zhenjun,Liu Liangjun.Experimental study on hydraulic model of spillway optimization in Dalong key water control
project[J].North China Water Resources and Electric Power Journal,2009,30( 3) : 25-28.
[5]付旭辉,杨胜发,刘良军,等.羊头铺水电站水工模型试验研究[J].小水电, 2008,139( 1) : 11-14.
Fu Xuhui,Yang Shengfa,Liu Liangjun,et al.Hydraulic model test and study about Yangtoupu hydropower station[J].Small Hydropower
Press,2008,139( 1) : 11-14.
[6]杨胜发,胡鹏飞,李立强,等.重庆市巫山县刘家沟水工模型研究报告[R].重庆: 重庆交通大学,2010.
Yang Shengfa,Hu Pengfei,Li Liqiang,et al.Chongqing Wushan
Liujiagou Hydraulic Model Study [R].Chongqing: Chongqing
Jiaotong University,2010.
[7]胡鹏飞,袁观栋.刘家沟水电站溢洪道进口导墙体型优化试验研究[J].吉林水利,2011( 1) : 25-27.
Hu Pengfei,Yuan Guandong.Experimental research on form optimization
for guide wall near the spillway entrance channel of Liujiagou
Hydropower Project[J].Jilin Water Resources,2011 ( 1 ) :
25-27.
[8]宋永嘉,田林钢,李河.溢洪道进水渠进口形式试验研究[J].人民黄河,2005,27( 9) : 56-57.
Song Yongjia,Tian Lingang,Li He.Experimental research on entrance
channel form of spillway[J].Yellow River,2005,27( 9) :56-57.