Journal of Chongqing Jiaotong University(Natural Science) ›› 2007, Vol. 26 ›› Issue (1): 48-51.
Previous Articles Next Articles
ZHANG Xing-lai 1,ZHONG Yun-jian 1,YANG Sheng-jie2 ,SHAO Dong3
Received:
Revised:
Online:
Published:
张兴来1,钟云健1,杨胜杰2,邵东3
作者简介:
Abstract: As forcible requirements for industry and basis for design work,design specifications ought to be precise and seri- Ons.At the~tnle time,it is a progress for design specification to develop to be perfect.Several issues of the new《Design Specifications for Highway Tunnel》(JTG D70-2004)ale put up,such as the coordination with other relevant starndrds and specifications ,highwaytunnel builddelimitationandinner contour,steelfibre spray concrete,as a referencefor discussion.
Key words: specification, cordination, highway tunnel build delimitation and inner contour, stel fibre spray concrete
摘要: 设计规范作为行业强制性设计要求为依据,应是严谨、严肃的,但它同时又有一个不断发展和完善的过程.通 过对新《公路隧道设计规范》(YrGD70--2004)使用中发现的与其它相关标准、规范的协调性、隧道建筑限界与内轮 廓、钢纤维喷射砼等几个问题的探讨,起到抛砖引玉的作用,供同行研讨、参考.
关键词: 规范, 协调性, 隧道建筑限界与内轮廓, 钢纤维喷射砼
CLC Number:
U452.2+1
ZHANG Xing-lai,ZHONG Yun-jian,YANG Sheng-jie,SHAO Dong. Discumion on the Issues of New Design Specifications for IIighway Tunnel[J]. Journal of Chongqing Jiaotong University(Natural Science), 2007, 26(1): 48-51.
张兴来,钟云健,杨胜杰,邵东. 公路隧道新设计规范中几个问题的探讨[J]. 重庆交通大学学报(自然科学版), 2007, 26(1): 48-51.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://xbzk.cqjtu.edu.cn/EN/
http://xbzk.cqjtu.edu.cn/EN/Y2007/V26/I1/48