XU You·fei,LIU Jun. Investigation on Rationality of High-Filled Embankment’S Settings on
Expressway in Mountainous Areas[J]. Journal of Chongqing Jiaotong University(Natural Science), 2011, 30(S1): 652-654.
[1]彭铁军.高填方路堤与高架桥方案之间选择的技术经济分析
[J].中南公路工程,2001,26(3):75-76.
PENG Tie-jun.Technical& economical analyses of choices be-
tween high filling embankment and viaduct[J].Central South
Highway Engineering,2001,26(3):75-76.
[2]谢伟强.山区高速公路高路堤与高架桥的选择[J]华东公路,
2010(4):54-55.
XIE Wei-qiang. Mountain area highway high embankment and the
choice of the viaduct[J].East China Highway,2010(4):54-55.
[3]霍明.山区高速公路勘察设计指南[M].北京:人民交通出版
社,2003.
[4]王春梅,胡继龙,侯岩峰.强夯再压实技术在渝邻路高填方路
堤中的应用[J].重庆交通学院学报,2007,26(2):97-100.
WANG Chun-mei,HU Ji-long,HOU Yan·feng.Application of re‘
dynamic compaction technique tO high embankment of Yu Lin ex‘
pressway[J].Journal of Chongqing Jiaotong University,2007,26
(2):97-100.
[5]郭乃正,邹金锋,杨/I,~L,等高填方路堤强夯试验与数值模拟
研究[J].铁道科学与工程学报,2007,4(3):140-143.
GUO Nai-zheng,ZOU Jin-feng,YANG Xiao-li,et a1.Research of
test and simulation on dynamic compaction in high roadbed[J]
Journal of Railway Science and Engineering,2007,4(3):1 40-
143.
[6]李日运,张明强,白坡.棉沙沟高填方路堤方案比选[J].中国
水运,2007,7(12):105-106.
LI Ri-yun.ZHANG Ming-qiang,BAI Po.Miansha ditch high em‘
bankment alternative schemes[J].China S Water Transportation,
2007.7(12):105-106.
nisMand stability analysis of the pianshan landslide in geheyan res-
erv0ir area 0f the middle reaches of the qingj iang rive[J].Journal
of Jilin University:Earth Science Edition,2009,39(5):874-