Hu Wenliang,Chen Yinchun. Analysis of Influence Characteristics of Multi-Arch Tunnel under
Adjacent Deep Foundation Pit Construction[J]. Journal of Chongqing Jiaotong University(Natural Science), 2013, 32(5): 934-937.
[1] 朱士云,侯爱民,潘建华,等. 地铁隧道正上方建筑物浅基坑施工技术[J]. 建筑科技, 2009,2( 2) : 102-105.
Zhu Shiyun,Hou Aimin,Pan Jianhua,et al. Construction technique of shallow foundation pit above subway tunnel [J]. Architecture Technology,2009,2( 2) : 102-105.
[2] 吴波,高波. 地铁区间隧道施工对近邻管线影响的三维数值模拟[J]. 岩石力学与工程学报, 2002, 12( 2) : 2451-2456.
Wu Bo,Gao Bo. 3-D Numerical simulation on effect of tunnel construction on adjacent pipeline [J]. Chinese Journal of Rock Mechanics and Engineering,2002,12( 2) : 2451-2456.
[3] 李志高,刘国彬,曾远,等. 基坑开挖引起下方隧道的变形控制[J].地下空间与工程学报, 2006,2( 3) : 264-270.
Li Zhigao,Liu Guobin,Zeng Yuan,et al. Control measures of Ttunnel displacement by over-excavation unloading [J]. Chinese Journal of Rock Mechanics and Engineering,2006,2( 3) : 264-270.
[4] 况龙川. 深基坑施工对地铁隧道的影响[J]. 岩土工程学报,2000,22( 3) : 57-62.
Kuang Longchuan. Influence of construction of deep foundation pit on tunnels of metro [J]. Chinese Journal of Geotechnical Engineering,2000( 3) : 57-62.
[5] 周建昆,李志宏. 紧邻隧道基坑工程对隧道变形影响的数值分析[J]. 地下空间与工程学报,2010,6( 增刊1) : 1398-1403.
Zhou Jiankun,Li Zhihong. Numerical analysis on deformation effect of metro tunnels due to adjacent excavation project [J]. Chinese Journal of Rock Mechanics and Engineering,2010, 6 ( S1 ) :1398-1403.
[6] Doege E,Bohnsack R. Closed die technologies for hot forging [J].Journal of Material Processing Technology,2000,98( 2) : 165-170.
[7] ZienKiewiez O C. The Finite Element Method [M]. 3rd ed. London:Mcgraw Hill, 1977.
[8] JTG D 70—2004 公路隧道设计规范[S]. 北京: 人民交通出版社, 2004.
JTG D 70—2004 Code for Design of Road Tunnel[S]. Beijing:China Communications Press,2004.