中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 2003, Vol. 22 ›› Issue (2): 29-32.

Previous Articles     Next Articles

A kind of construction control system of large-span P.C.cable-stayed bridge

CHEN Hong,LAN Hai-yan,XIAO Jun-liang   

  1. Department of Bridge & Structure Engineering,Chongqing Jiaotong University,Chongqing 400074,China
  • Received:2002-07-31 Revised:2002-09-26 Online:2003-06-15 Published:2015-05-18

大跨度预应力砼斜拉桥的一种施工控制方法

陈红,兰海燕,肖军良   

  1. 重庆交通学院桥梁及结构工程系,重庆 400074
  • 作者简介:陈红(1976—),女,四川武胜人,硕士,从事大跨径桥梁空间非线性分析研究工作.

Abstract: Based on the theory of construction control, a kind of control system of large-span P.C.cable-stayed bridge is presented, which has been adopted in the construction of large-span P. C. cable-stayed bridge and has been proved applicable and effective.The bridge configuration control and cable forces control can be effectively achieved, which are valuable references for the construction control of P.C.cable-stayed bridge.

Key words: P.C.cable-stayed bridge, construction control, test of stress and cable forces, temperature amendments

摘要: 应用工程控制的基本原理,阐述了砼斜拉桥的一种控制方法,该方法运用于某特大砼斜拉桥的施工中,取得了显著的效果,达到了斜拉桥索力与线型的/双控0目的,对斜拉桥的施工控制,有一定的参考价值.

关键词: 预应力砼斜拉桥, 施工控制, 应力与索力测试, 温度修正

CLC Number: