Abstract: On the bassis of S5optimized design drawing of 皿 surrounding rock masses and measured data in site in Yangzong expressway tunnel, obtaning Eand K of surrounding rock masses by back analysis ;the dynamic emulation simulatation of construction process has been conducted with FEM methods, feedback controlling design is realized and the construction is controlled.
Key words: Yangzong tunnel ;displacement back analysis, FEM numerical simulation
摘要: 根据昆明一石林高速公路阳宗隧道5S型支护衬砌设计优化调整方案和X多38+蛇6断面现场监控量测数据,进行位移反分析,得到计算所需的围岩弹性模量E和侧压力系数凡;然后运用有限元方法,对其试验洞段上下台阶开挖动态施工过程进行仿真数值模拟研究,从而反馈调整和指导施工.
关键词: 阳宗隧道, 位移反分析, 有限元仿真数值模拟
CLC Number:
U451+.2
ZHANG Peng-yong,XU Lin-sheng,WANG Xin-ping. Numerical simlation of dynamic emulation on construction process in Yangzong expressway tunnel[J]. Journal of Chongqing Jiaotong University(Natural Science), 2003, 22(4): 7-10.
张鹏勇,徐林生,王新平. 阳宗隧道试验段动态开挖过程的数值模拟研究[J]. 重庆交通大学学报(自然科学版), 2003, 22(4): 7-10.