Journal of Chongqing Jiaotong University(Natural Science) ›› 2003, Vol. 22 ›› Issue (4): 93-95.
Previous Articles Next Articles
WU Jia-you,LIU SHU-Hong
Received:
Revised:
Online:
Published:
吴家友,刘术红
作者简介:
Abstract: For new urban districts,the traditional 4-phase transportation demand forccasting model can not meet the meet of the master planning due to the lack of the trip generation & distribution phase data.There are lots of difference between new blocks and constructed blcoks. How to differntiate the difference is a problem in traffic forecastin.Analyses based on locatpn potential energy proides a way to solve the problem .
Key words: new blocks;traffic forecast, locatpn potential energy
摘要: 对于新建城市(区),传统的四阶段交通需求预测模式难以适应城市总规阶段交通规划的需要,因为出行生成和分布预测阶段所必需的条件无法满足.新城区与建成区在交通特性上有很大的差异,交通总体需求预测过程中一个难题是如何量化分析这一差异.通过对区位势能的研究,可以很好地量化分析新城区交通总体需求预测问题.
关键词: 新城区, 交通总体需求预测, 区位势能
CLC Number:
TU984.141
U412.1+2
WU Jia-you,LIU SHU-Hong. Research on forecasting model of new blocks[J]. Journal of Chongqing Jiaotong University(Natural Science), 2003, 22(4): 93-95.
吴家友,刘术红. 基于区位势能的新城区总体交通需求预测模型探讨[J]. 重庆交通大学学报(自然科学版), 2003, 22(4): 93-95.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://xbzk.cqjtu.edu.cn/EN/
http://xbzk.cqjtu.edu.cn/EN/Y2003/V22/I4/93