Journal of Chongqing Jiaotong University(Natural Science) ›› 2004, Vol. 23 ›› Issue (3): 13-17.
Previous Articles Next Articles
TANG Liang, 1 PAN Chen-hai2
Received:
Revised:
Online:
Published:
唐亮,1潘承海2
作者简介:
Abstract: Trickling water frequently occurs in the outside appearance of biconnected arch tunnels after the secondary lining, influencing their construction quality and operating. In the construction of biconnected arch tunnels in Tongyou Mountain Tunnel, Yinzi Mountain Tunnel No.1, Yinzi Mountain Tunnel No.2 in South Second Ring Road in city of Liouzhou in Guangxi Zhuangzu Autonomous Region, in the light of comprehensive treatments "combining blinding with draining, couple rigidity with flexibility, mult
Key words: biconnected arch tunnels, secondary lining, trickling water, treatments
摘要: 在双连拱隧道施工中,二次衬砌完成后表面往往会出现渗漏水现象,对双连拱隧道施工质量及营运造成影 响.笔者结合广西柳州市南二环路桐油山隧道、银仔山1#隧道、银仔山2#隧道等双连拱隧道群施工中,按照“堵排 结合,刚柔相济,多道设防,适应变形”的综合治理原则,对出现渗漏水的部位及原因进行分析,采取了不同的治理 方法,取得了较好的效果
关键词: 双连拱隧道, 二次衬砌, 渗漏水, 治理
CLC Number:
U455.4
TANG Liang, PAN Chen-hai. The treatments of trickling water after secondary lining of biconnected arch tunnels[J]. Journal of Chongqing Jiaotong University(Natural Science), 2004, 23(3): 13-17.
唐亮,1潘承海2. 柳州市南二环路双连拱隧道群 二次衬砌渗漏水治理方法[J]. 重庆交通大学学报(自然科学版), 2004, 23(3): 13-17.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://xbzk.cqjtu.edu.cn/EN/
http://xbzk.cqjtu.edu.cn/EN/Y2004/V23/I3/13