[1] Ghauch Z G,Abou-Jaoude G G.Strain response of hot-mix asphalt overlays in jointed plain concrete pavements due to reflective cracking [J].Computers & Structures,2013,124:38-46.
[2] Souza F V,Castro L S.Effect of temperature on the mechanical respon hermo-viscoelastic asphalt pavements[J].Construction and Building Materials,2012,30:574-582.
[3] Liu K,Wang F.Computer modeling mechanical analysis for asphalt overlay coupling action of temperature and loads[J].Procedia Engineering,2011,15:5338-5342.
[4] 弋晓明,张宏博,张瑜洪,等.旧水泥路破碎改造后加铺半刚性基层沥青路面结构破损机理分析[J].中外公路,2011,31(1):74-77.
Yi Xiaoming,Zhang Hongbo,Zhang Yuhong et al.Damage mechanism analysis of the semi-rigid base asphalt pavement overlaying on the rubblized cement concrete pavement[J].Journal of China & Foreign Highway,2011,31(1):74-77.
[5] Qiang X,Lei L.Hydraulic-stress coupling effects on dynamic behavior of asphalt pavement structure material [J].Construction and Building Materials,2013,43:31-36.
[6] Xue Q,Liu L,Zhao Y,et al.Dynamic behavior of asphalt pavement structure under temperature-stress coupled loading[J].Applied Thermal Engineering,2013,53(1):1-7.
[7] Kim S M,Nelson P K.Experimental and numerical analyses of PCC overlays on PCC slabs-on-grade subjected to climatic loading[J] .International Journal of Solidsand Structures,2004,41(3/4):785-800.
[8] Zhou Zhi,Liu Wanqiu,Huang Ying,et al.Optical fiber Bragg grating sensor assembly for 3D strain monitoring and its case study in highway pavement[J].Mechanical Systems and Signal Processing,2012,28:36-49.
[9] 董泽蛟,柳浩,谭忆秋,等.沥青路面三向应变响应现场实测研究[J].华南理工大学学报:自然科学版,2009,37 (7):46-51.
Dong Zejiao Liu Hao,Tan Yiqiu et al.Field measurement of three direction strain response of asphalt pavement[J].Journal of South China University of Technology:Natural Science,2009,37 (7):46 -51.
[10]吕惠卿,张湘伟,张荣辉.破损水泥混凝土路面加铺 AC路面的力学性能监测方法研究[J].公路交通科技:应用技术版,2010,6(6):121-124.
Lv Huiqing,Zhang Xiangwei,Zhang Ronghui.Research on Mechanical property monitoring method for the asphalt pavement overlaying on the damaged cement concrete pavement[J].Journal of Highway and Transportation Research and Development,2010,6(6):121-124.
|