[1]中铁第一勘察设计院集团有限公司,北京交通大学.含水弱胶结砂岩地层物理力学参数试验研究[R].西安:中铁第一勘察设计院集团有限公司,2010.
China Railway First Survey & Design Institute Group Co.,Ltd.,Beijing Jiaotong University.Experimental Study on Physical and Mechanical Parameter of Rich Water Weak Cementation Sandstone Formation [R].Xi’an:China Railway First Survey & Design Institute Group Co.,Ltd.,2010.
[2]中铁第一勘察设计院集团有限公司,北京交通大学.兰渝线桃树坪、胡麻岭隧道施工调研报告[R].西安:中铁第一勘察设计院集团有限公司,2010.
China Railway First Survey & Design Institute Group Co.,Ltd.,Beijing Jiaotong University.The Construction Research Report of Taoshuping,Humaling Tunnels on Lan-Yu Railway [R].Xi’an:China Railway First Survey & Design Institute Group Co.,Ltd.,2010.
[3]甄秉国.兰渝线桃树坪隧道区域上第三系砂岩工程特性分析[J].铁道建筑,2013(5):55-57.
Zhen Bingguo.The analysis of engineering characteristics to the third series sandstone about the region of Lan-Yu railway Taoshuping tunnel [J].Railway Engineering,2013(5):55-57.
[4]高程.第三系软弱围岩地下水环境效应研究[D].成都:西南交通大学,2013.
Gao Cheng.The Ground Water Environment Effect Study of the Third Series Weak Surrounding Rock [D].Chengdu:Southwest Jiaotong University,2013.
[5]中铁第一勘察设计院集团有限公司.桃树坪、胡麻岭隧道第三系砂岩地段试验段总结报告[R].西安:中铁第一勘察设计院集团有限公司,2011.
China Railway First Survey & Design Institute Group Co.,Ltd..The Conclusion Report on the Third Series Sandstone Test Section of Taoshuping and Humaling Tunnels [R].Xi’an:China Railway First Survey & Design Institute Group Co.,Ltd.,2011.
[6]赵清泊.胡麻岭隧道斜井富水粉细砂地层松动圈测试与围岩压力计算[J].现代隧道技术,2012,49(4):17-21.
Zhao Qingbo.Loose rock zone measurements and rock mass pressure calculations for a saturated fine silt stratum [J].Modern Tunneling Technology,2012,49(4):17-21.
[7]中铁第一勘察设计院集团有限公司.胡麻岭隧道第三系含水砂岩工程降水水文地质分析报告[R].西安:中铁第一勘察设计院集团有限公司,2012.
China Railway First Survey & Design Institute Group Co.,Ltd..The Hydrogeology Analysis Report about the Third Series Water Sandstone Engineering Precipitation of Humaling Tunnel [R].Xi’an:China Railway First Survey & Design Institute Group Co.,Ltd.,2012.
[8]李世才.桃树坪隧道富水未成岩粉细砂试验段施工技术[J].现代隧道技术,2012,49(4):111-119.
Li Shicai.Construction techniques for the experimental section of the Taoshuping tunnel in water-rich non-digenetic fine sand [J].Modern Tunneling Technology,2012,49(4):111-119.
[9]中铁第一勘察设计院集团有限公司,西南交通大学.兰渝线桃树坪、胡麻岭隧道第三系砂岩水稳特性与围岩稳定性关系研究[R].西安:中铁第一勘察设计院集团有限公司,2013.
China Railway First Survey & Design Institute Group Co.,Ltd.,Southwest Jiaotong University.The Relationship Research between Water Stable Characteristics and the Stability of Surrounding Rock about the Third Series Sandstone of Taoshuping,Humaling Tunnels on Lan-Yu Railway [R].Xi’an:China Railway First Survey & Design Institute Group Co.,Ltd.,2013. |