[1] 唐海航.北川救灾物资堆积四年未动—爱心无需储备,慈善贵在及时[EB/OL].福音时报,2012-03-20 [2014-09-15].http://www.gospeltimes.cn/ news/18853.
Tang Haihang.In the past four years,relief materials did not move in Beichuan County—love without reserve,charity need a timely manner [EB/OL].Gospel Times,2012-03-20 [2014-09-15].http://www.gospeltimes.cn/news/18853.
[2] 王宇.菲律宾灾区救援物资堆积如山,灾民苦等[EB/OL].大公网,2013-11-20[2014-09-15].http://news.takungpao.com/world/exclusive/ 2013-11/2040149.html.
Wang Yu.Relief supplies are stacked in the Philippines,but the victims still need to wait [EB/OL].Dagongwang,2013-11-20[2014-09-15].http://news.takungpao.com/world/exclusive/2013-11/ 2040149.html.
[3] 王军荣.救灾物资霉烂拷问应急式救灾[EB/OL].光明网,2014-05-01 [2014-09-15] .http://guancha.gmw.cn/2014-05/01/content_11192688.htm.
Wang Junrong.Relief supplies mildew problem is the challenge for emergency relief[EB/OL].Guangmingwang,2013-11-20[2014-09-15].http://guancha.gmw.cn/2014-05/01/content_11192688.htm.
[4] Gupta J N D,Gupta S K.Single-facility scheduling with nonlinear processing time [J].Computers & Industrial Engineering,1988,14(4):387-393.
[5] Mosheiov G.V-shaped policies for scheduling deteriorating jobs [J].Operations Research,1991,39(6):979-991.
[6] 张峰.工件加工时间增加的排序问题[J].高校应用数学学报A辑,2001,16(2):228-234.
Zhang Feng.Scheduling to minimize makespan about increase processing times [J].Applied Mathematics of College:Part A,2001,16(2):228-234.
[7] Zhao C L,Ling Z Q,Yong T H.Scheduling problems under linear deterioration [J].Acta Automatica Sinica,2003,29(4):531-535.
[8] Lee W C.A note on deteriorating jobs and learning in single-machine scheduling problems [J].International Journal of Business and Economics,2004,3(1):83 - 89.
[9] Wang J B.Single-machine scheduling problems with the effects of learning and deterioration [J].Omega,2007,35(4):397-402.
[10]Yang S J,Hsu C J,Yang D L.Single-machine scheduling with due-date assignment and aging effect under a deteriorating maintenance activity consideration [J].International Journal of Inofrmation and Management Sciences,2010,21(2):177195.
[11]刘春来,赵传立.工期窗口安排与具有退化效应和维修活动的单机排序[J].数学的实践与认识,2012,42(11):121-130.
Liu Chunlai,Zhao Chuanli.Due-window assignment and single-machine scheduling with aging effect and maintenance [J].Mathematics in Practice and Theory,2012,42(11):121-130.
[12]Brown G G,Vassiliou A L.Optimizing disaster relief:real-time operational and tactical decision support [J].Naval Research Logistics,1993,40(1):1-23.
[13]Barbarosoglu G,Arda Y A.Two-stage stochastic programming framework for transportation planning in disaster response [J].Journal of the Operational Research Society,2004,55(1):43-53.
[14]Sheu Jubing.An emergency logistics distribution approach for quick response to urgent relief demand in disasters [J].Transportation Research:Part E:Logistics and Transportation Review,2007,43(6):687-709.
[15]Fiedrich F,Gehbauer F ,Rickers U.Optimized resource allocation for emergency response after earthquake disasters [J].Safety Science,2000,35(1/3):41-57.
[16]缪成,许维胜,吴启迪.大规模应急救援物资运输模型的构建与求解[J].系统工程,2006,24(11):6-12.
Miao Cheng,Xu Weisheng,Wu Qidi.A transportation modal and solution of large-scale emergency relief commodities [J].Systems Engineering,2006,24(11):6-12.
[17]Sheu Jubing.Dynamic relief-demand management for emergency logistics operations under large-scale disasters [J].Transportation Research:Part E:Logistics and Transportation Review,2010,46(1):1-17.
[18]Rawls C G ,Turnquist M A.Pre-positioning of emergency supplies for disaster response [J].Transportation Research:Part B:Methodological,2010,44(4):521-534.
[19]Rawls C G,Turnquist M A.Pre-positioning and dynamic delivery planning for short-term response following a natural disaster [J].Socio-Economic Planning Sciences,2012,46(1):46-54. |