Journal of Chongqing Jiaotong University(Natural Science) ›› 2001, Vol. 20 ›› Issue (1): 34-36.
Previous Articles Next Articles
SUN Guo hua
Online:
Published:
孙国华
基金资助:
Abstract: The paper is based on the working particle for several bridges in the construction of W8 section of Sheng yan Railway project.It systematicaly instructs the construction method of bore hole filling pile in the rock area with under earth mined out layer.
Key words: under earth mined out layer, bore hole filling pile, completed pile
摘要: 笔者以神延铁路W8标段多座桥梁工程实践为基础 ,系统介绍了有地下采空层的岩石地区钻孔灌注桩施工的方法
关键词: 地下采空层, 钻孔灌注桩, 成桩
CLC Number:
TU753.3
SUN Guo hua. Completed pile working method of bore hole filling pile in the rock area with under-earth mined out layer[J]. Journal of Chongqing Jiaotong University(Natural Science), 2001, 20(1): 34-36.
孙国华. 有地下采空层的岩石地区钻孔灌注桩成桩工法[J]. 重庆交通大学学报(自然科学版), 2001, 20(1): 34-36.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://xbzk.cqjtu.edu.cn/EN/
http://xbzk.cqjtu.edu.cn/EN/Y2001/V20/I1/34