Journal of Chongqing Jiaotong University(Natural Science) ›› 2001, Vol. 20 ›› Issue (1): 34-36.

Previous Articles     Next Articles

Completed pile working method of bore hole filling pile in the rock area with under-earth mined out layer

SUN Guo hua   

  1. The 5th Engineering Department of No 11 Engineering Bureau of China Railway Construction Corporation,Chongqing 400037,China
  • Online:2001-02-20 Published:2016-04-22

有地下采空层的岩石地区钻孔灌注桩成桩工法

孙国华   

  1. 中国铁道建筑总公司第十一工程局第五工程处 重庆400037
  • 基金资助:
    国家自然科学基金项目(59838310 )

Abstract: The paper is based on the working particle for several bridges in the construction of W8 section of Sheng yan Railway project.It systematicaly instructs the construction method of bore hole filling pile in the rock area with under earth mined out layer.

Key words: under earth mined out layer, bore hole filling pile, completed pile

摘要: 笔者以神延铁路W8标段多座桥梁工程实践为基础 ,系统介绍了有地下采空层的岩石地区钻孔灌注桩施工的方法

关键词: 地下采空层, 钻孔灌注桩, 成桩