Journal of Chongqing Jiaotong University(Natural Science) ›› 2001, Vol. ›› Issue (S1): 17-22.
Previous Articles Next Articles
XIANG Zhong fu,XU Jun lan,WANG Yin hui,GU An bang,HE Hai qun
Received:
Online:
Published:
向中富,徐君兰,王银辉,顾安邦,何海群
Abstract: The analytical method and model of structure during the construction of arch bridge with the aid of centring is studied in the paper.The feasibility of the analytical method and model and the importance of the structural analysis during the course of construction are testified by the comparison of the result from theoretical analysis,simulation test and measurement on the bridge.
Key words: arch bridge constructed by centring, construction process, structural analysis
摘要: 针对拱桥拱架施工过程实际研究了其结构行为分析方法与模型 ;通过实桥分析、模型试验和实桥测试结果比较证明了其分析方法的可行性和进行拱桥拱架施工过程中的结构行为分析的重要性
关键词: 拱架施工拱桥, 施工过程, 结构分析
CLC Number:
U441
XIANG Zhong fu,XU Jun lan,WANG Yin hui,GU An bang,HE Hai qun. Structural analysis during the course of construction of arch bridge with the aid of centring[J]. Journal of Chongqing Jiaotong University(Natural Science), 2001, (S1): 17-22.
向中富,徐君兰,王银辉,顾安邦,何海群. 拱桥拱架施工过程中的结构行为分析[J]. 重庆交通大学学报(自然科学版), 2001, (S1): 17-22.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://xbzk.cqjtu.edu.cn/EN/
http://xbzk.cqjtu.edu.cn/EN/Y2001/V/IS1/17