中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 1991, Vol. 10 ›› Issue (1): 59-70.

Previous Articles     Next Articles

The First Research on Warrants of the Construction of a Pedestrian Facility of a Signal-Controlled Intersection——Analysis and Computation of Pedestrian Capacity on a Crosswalk

Li Shuqing   

  1. Highway Engineering Department
  • Online:1991-02-25 Published:2016-11-09

灯控交叉口行人过街设施设置依据研究[之一]——人行横道行人通行能力分析与计算

李淑庆   

  1. 路工系

Abstract: After testing the arrival law of pedestrians and vehicles which arrive at a crosswalk of a signal-controlled intersection, according to the newly-promulgated regulation (the Road Traffic Management Regulation), this paper analyses and reckons out the pedestrian capacity on the crosswalk with or without pedestrian islands and signals. In the light of the volume of pedestrian crossing, it proposes the warrants on which the construction of pedestrian islands, signals and bridges or subways depends.

Key words: signal-controlled intersection, crosswalk, pedestrian crossing facility

摘要: 本文在检验行人、车辆到达灯控交叉口人行横道的到达规律后,按新颁布的《道路交通管理条例》,分析计算出有、无行人过街安全岛、行人过街信号灯时,灯控交叉口人行横道的行人通行能力,并根据行人过街量大小提出了行人过街安全岛、行人过街信号灯和行人过街天桥或地道设置依据的建议值。

关键词: 灯控交叉口, 人行横道, 行人过街设施