Journal of Chongqing Jiaotong University(Natural Science) ›› 1985, Vol. 4 ›› Issue (2): 31-37.
Previous Articles Next Articles
Zhao Yingqi
Received:
Online:
Published:
赵瑛琪
Abstract: This Paper Presents a new method of the seepage calculation of earth dams, and obtains the formula as follow:f(a0)=(H12-(a0+H2)2)/(2[(m1H1/(2m1+1))+m1(Hn-H1)+b+m2(Hn-a0-H2)])-a0/m2(1+In((a0+H2)/a0))=0 and it also gives the computation program of the seepage calculation of earth dams for the pocket computer PC-1500. Three examples included at the end of this paper.
摘要: 本文提出土坝渗流计算一个新的解法,得到求解逸出高度α0的二分法公式为:f(a0)=(H12-(a0+H2)2)/(2[(m1H1/(2m1+1))+m1(Hn-H1)+b+m2(Hn-a0-H2)])-a0/m2(1+In((a0+H2)/a0))=0本文给出PC-1500袖珍计算机的通用计算程序,最后列举了三个计算实例。
Zhao Yingqi. The Seepage Calculation of Earth Dams[J]. Journal of Chongqing Jiaotong University(Natural Science), 1985, 4(2): 31-37.
赵瑛琪. 土坝渗流计算[J]. 重庆交通大学学报(自然科学版), 1985, 4(2): 31-37.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://xbzk.cqjtu.edu.cn/EN/
http://xbzk.cqjtu.edu.cn/EN/Y1985/V4/I2/31