Abstract: Conventional methods of energy dissipation by single-fall hydraulic jump-type stilling basin, roller bucket, or ski-jumpbucket may not be suitable for high dam spillways be-cause of very high velocity at the end of the spillways, niadc-quatc tailwater depthw, or Side Coditions. A suitable spillway alternative can be a cascade of falls with a still-ingbasin below each fall. This paper presents a computing method for the design of cascade stilling basins for high dam spillways. The design is demenstrated by a numcrical example.
Key words: High dam spillway, cascade stilling basin, computing method
摘要: 本文改进了多级跌水阶梯式消力池设计所需用到的有关方程,介绍了自由水跃高度曲线,消力池池深,跌水个数,凸槛高度等水力要素的简化计算方法与步骤,并给出了典型工程的算例。
关键词: 高坝溢洪道, 阶梯式消力池, 计算方法
Tan Zhcnhong, Bai Zipei. Computing Method for the Design of Cascade Stilling Basins for High Dam Spillways[J]. Journal of Chongqing Jiaotong University(Natural Science), 1993, 12(3): 1-7.
谭振宏, 白子培. 高坝溢洪道阶式消力池水力计算[J]. 重庆交通大学学报(自然科学版), 1993, 12(3): 1-7.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://xbzk.cqjtu.edu.cn/EN/
http://xbzk.cqjtu.edu.cn/EN/Y1993/V12/I3/1