[1] NISHI T, MUROI Y, INUIGUCHI M. Column generation with dual inequalities for railway crew scheduling problems [J].
Public Transport, 2011, 3(1):25-42.
[2] AlEFRAGIS P, SANDERS P, TAKKULA T, et al. Parallel integer optimization for crew scheduling [J]. Annals of
Operations Research, 2000, 99(4):141-166.
[3] JTTE S. Divide-and-price: a decomposition algorithm for solving large railway crew scheduling problems [J].
European Journal of Operational Research, 2012, 219(2):214-223.
[4] VEELENTURF L P, POTTHOFF D, HUISMAN D, et al. Railway crew rescheduling with retiming [J]. Transportation Research
Part C, 2009, 20(1):95-110.
[5] HANAFI R, KOZAN E. A hybrid constructive heuristic and simulated annealing for railway crew scheduling [J].
Computers & Industrial Engineering, 2014, 70(1):11-19.
[6] 余祖俊.保证轻轨司机双休日的“双齿轮”轮班模型及其均衡算法研究[J].北京交通大学学报,2006,30(1):75-78.
YU Zhujun .Research on double-gear shift work model and equilibrium algorithm for light railway drivers with double day-
off [J].Journal of Beijing Jiaotong University,2006,30(1):75-78.
[7] 李献忠,徐瑞华.基于乘务广义费用的城市轨道交通排班[J].同济大学学报(自然科学版),2007,35(6):750-754.
LI Xianzhong, XU Ruihua. An optimal wide crew-related costs-based scheduling for crew of urban rail transportation [J ].
Journal of Tongji University (Natural Science), 2007, 35(6):750-754.
[8] 李献忠,徐瑞华.基于时间耗费的城市轨道交通乘务排班优化[J].铁道学报,2007,29(1):21-25.
LI Xianzhong, XU Ruihua.Optimization of crew scheduling for urban rail transportation based on time costs[J].Journal of
the China Railway Society,2007,29(1):21-25.
[9] 张增勇,毛保华,杜鹏,等.基于惩罚费用的城市轨道交通乘务排班优化模型与算法[J].交通运输系统工程与信息,2014,14 (2):113-
120.
ZHANG Zengyong ,MAO Baohua,DU Peng,et al. Urban rail transit crew scheduling model and algorithm based on punishment costs
[J].Journal of Transportation Systems Engineering and Information Technology, 2014,14(2):113-120.
[10] 吴玲玲,晏克非,陈刚.基于遗传算法的轨道交通线路排班优化研究[J].计算机科学, 2007,34(3):211-212.
WU Linlin ,YAN Kefei,CHEN Gang. Optimization of schedule of rail transit based on genetic algorithm[J].Computer Science,
2007,34(3):211-212.
[11] 丰富,陈绍宽,杜鹏.考虑时间均衡度的城市轨道交通乘务排班计划优化方法[J].交通运输系统工程与信息, 2014(6):164-170.
FENG Fu,CHENG Shaokuan ,DU Peng. Time equitability-based crew scheduling optimization for urban rail transit [J].Journal
of Transportation Systems Engineering and Information Technology,2014(6):164-170.
[12] GB5599—1985,铁道车辆动力学性能评定和试验鉴定规范[S]. 中华人民共和国国家质量监督检验检疫总局,中国国家标准化管 理委
员会,1985.[Railway Vehicles-S Pecification for Evaluation the Dynamic Performance and Accreditation Test
[S].Standardization Administration of the People's Republic of China General Administration of Quality
Supervision,Inspection and Quarantine of the people's Republic of China,1985.[12] 赵红星.层次分析法在铁路工程评标 指标
权重中的应用[J].铁道工程学报,2012,29(10):120-123.
ZHAO Hongxing.The application of ahp in the bird evaluation index weight of the railway construction[J].Journal of
Railway Engineering Society, 2012, 29(10): 120-123. |