[1] 项彦茂,曾德子,高燕梅,等.装配式钢桁-混凝土组合连续刚构桥预制桥道板制作工艺研究[J].重庆交通大学学报(自然科学版),2018,37(9):16-22.
XIANG Yanmao, ZENG Dezi, GAO Yanmei, et al. Precast concrete decks production technology of prefabricated steel truss-concrete composite continuous rigid frame bridge[J]. Journal of Chongqing Jiaotong University (Natural Science), 2018, 37(9): 16-22.
[2] 周志祥.PCSS剪力联结构造:0130786.4[P].2016-09-31.
ZHOU Zhixiang. PCSS Shear Force Structure: 0130786.4[P]. 2016-09-31.
[3] 周志祥.预应力钢桁-混凝土组合连续刚构桥梁及施工方法:ZL200910104675.X[P].2012-07-04.
ZHOU Zhixiang. Prestressed Steel Truss-Concrete Composite Continuous Rigid Frame Bridge and Construction Method: ZL200910104675.X[P]. 2012-07-04.
[4] GAO Yanmei, ZHOU Zhixiang, LIU Dong, et al. Cracking of a prefabri-cated steel truss-concrete composite beam with pre-embedded shear studs under hogging moment[J]. Steel and Composite Structures, 2016, 21(5): 981-997.
[5] 刘辉.装配式钢桁-砼组合连续刚构桥施工阶段结构性能研究[D].重庆:重庆交通大学,2016.
LIU Hui. Study on the Performance of Prefabricated Steel Truss-Concrete Composite Continuous Rigid Frame Bridge during Construction Stage[D]. Chongqing: Chongqing Jiaotong University, 2016.
[6] KUHLMANN U, KURSCHER K. Structural behaviour of horizontally lying shear studs[C]// American Society of Civil Engineers 5th International Conference on Composite Construction in Steel and Concrete. Kruger Nation Park, South Africa: American Society of Civil Engineers, 2004: 534-543.
[7] SILVANA D N, ANA L H C, DEBS E. Study of partially encased composite beams with innovative position of stud bolts[J]. Journal of Constructional Steel Research, 2009, 65(2): 342-350.
[8] 张庭杰.PCSS剪力连接件极限承载力计算方法研究[D].重庆:重庆交通大学,2016.
ZHANG Tingjie. Study on the Calculation Method of Ultimate Bearing Capacity of PCSS Shear Connectors[D]. Chongqing: Chongqing Jiaotong University, 2016.
[9] 范亮,李笑,何骏.考虑界面效应的钢-混凝土组合结构有限元模拟方法[J].重庆交通大学学报(自然科学版),2017,36(7):7-14.
FAN Liang, LI Xiao, HE Jun. Finite element simulation method of steel-concrete composite structure considering the interface effect[J]. Journal of Chongqing Jiaotong University(Natural Science), 2017, 36(7): 7-14.
[10] 宋小明.装配式钢-混凝土组合构件的剪力联结受力性能试验研究[D].重庆:重庆交通大学,2017.
SONG Xiaoming. Experimental Study on Mechanical Properties of Shear Connectors of Prefabricated Steel-Concrete Combined Structures[D]. Chongqing: Chongqing Jiaotong University, 2016.
[11] 逯文茹.钢锚箱式钢-混组合索塔锚固体系受力性能与设计方法研究[D].西安:长安大学,2015.
LU Wenru. Study on Mechanical Behavior and Design Method of Steel-Concrete Composite Pylon Anchorage System with Steel Anchor Box[D]. Xian: Changan University, 2015.
[12] 宋随弟,祝兵,陈克坚,等.不同类型剪力连接件的破坏过程及破坏机理研究[J].铁道建筑,2016(12):37-40.
SONG Suidi, ZHU Bing, CHEN Kejian, et al. Study on failure process and failure mechanism for different types of shear connector[J]. Railway Engineering, 2016 (12): 37-40.
[13] 上海市城市建设设计研究总院,同济大学.钢-混凝土组合桥梁设计规范:GB50917—2013[S].北京:中国计划出版社,2013.
Shanghai Institute of Urban Construction and Design, Tongji University. Code for Design of Steel and Concrete Composite Bridges: GB50917—2013[S]. Beijing: China Planning Press, 2013.
[14] 薛伟辰,丁敏,王骅,等.单调荷载下栓钉连接件受剪性能试验研究[J].建筑结构学报,2009,30(1):95-100.
XUE Weichen, DING Min, WANG Ye, et al. Experimental studies on behavior of stud shear connectors under monotonic loads[J]. Journal of Building Structures, 2009, 30(1): 95-100.
[15] 陈宝春,陈津凯.钢管混凝土内栓钉抗剪承载能力试验研究[J].工程力学,2016,33(2):66-73.
CHEN Baochun, CHEN Jinkai. Experimental studies on shear-bearing capacity of headed stud in concrete-filled steel tube[J]. Engineering Mechanics, 2016, 33(2): 66-73. |