[1]Ang A H-S.Practical Assessments of Risk and Its Uncertainty[C].Kobe,Japan:Proc.IFIP Workshop,2006.
[2]Ang A H-S,Tang W H.Probability Concepts in Engineering[M].2nd Edition.New York:John Wiley&Sons,Inc.,2007.
[3]Ang A H-S,Tang W H.Probability Concepts in Engineering Plan-ning and Design:Vol II[M].New York:John Wiley&Sons,Inc.,1984.
[4]Han S H,Ang A H-S.Optimal Design of Cable-Stayed BridgesBased on Minimum Life-Cycle Cost[C].Seoul,Korea:Proceed-ings,IABMAS'08,2008.
[5]Han S H,Shin J C.The stochastic finite element analysis and reli-ability analysis subjected to earthquake load[J].Journal of Com-putational Structural Engineering Institute of Korea,2005,18(1):29-42.
[6]Korea Institute of Construction Technology.A Study on Design andConstruction Method for Long Span Bridges[R].Report ID KICT/95-SE-111-64.Goyang-Si Gyeonggi-Do:Korea lnstitnte ofContruction Technology,1995.
[7]Ang A H-S,De Leon D.Modeling and analysis of uncertainties forrisk-informed decisions in infrastructures engineering[J].Journal ofStructure&Infrastructure Engineering,2005,1(1):19-31.
[8]Frangopol D M,Lin K Y.Life-cycle cost design of deterioratingstructures[J].Journal of Structure Engineering,ASCE,1997,123(10):1390-1401.
[9]Ang A H-S,Pires J,Lee J C.Reliability-based Optimal AseismicDesign of Reinforced Concrete Building,Year 2[R].Kajima:CU-REe,1996.
[10]Lee K M,Cho H N,Choi Y M.Life-cycle cost effective optimumdesign of steel bridges[J].Elsevier:Journal of Constructional Re-search,2004,60:1585-1613.