[1] 刘生奇,蒋本俊.武汉二七长江大桥跨中钢梁合龙施工技术[J].桥梁建设,2012,42(4):7-13.
LIU Shengqi, JIANG Benjun. Construction techniques for closure of midspan steel girder of Wuhan Erqi Changjiang river bridge[J]. Bridge Construction, 2012, 42(4): 7- 13.
[2] 蔚永旺,陈艳芳.宽幅组合梁斜拉桥合龙控制关键技术研究[J].城市道桥与防洪,2020(3):118-122.
WEI Yongwang, CHEN Yanfang. Study on key technology of closure control for wide composite beam cable-stayed bridge[J]. Urban Roads Bridge & Flood Control, 2020(3): 118-122.
[3] 郭爱平,姜阿娟,张伟山.恩来高速公路忠建河特大桥施工监控[J].桥梁建设,2018,48(6):110-115.
GUO Aiping, JIANG Ajuan, ZHANG Weishan. Construction control of Zhongjian river bridge on Enshi-Laifeng expressway[J]. Bridge Construction, 2018, 48(6): 110-115.
[4] 胡海波.武汉二七长江大桥主桥结合梁施工技术[J].桥梁建设,2012,42(3):1-6.
HU Haibo. Construction techniques for composite girder of main bridge of Wuhan Erqi Changjiang river bridge[J]. Bridge Construction, 2012, 42(3): 1-5.
[5] 刘明虎,谭皓,徐国平,等.大跨径混合梁斜拉桥合龙技术研究与实践[J].桥梁建设,2011(4):83-87.
LIU Minghu, TAN Hao, XU Guoping, et al. Research and practice of closure techniques for long span hybrid girder cable-stayed bridge[J]. Bridge Construction, 2011(4): 83-87.
[6] 易云焜,谢泽福,牛海喜.厦漳跨海大桥南汊主桥定时合龙技术[J].桥梁建设,2013,43(2):105-109.
YI Yunkun, XIE Zefu, NIU Haixi. Technique of fixed time closure for main bridge of south bridge of Xiazhang sea-crossing bridge[J]. Bridge Construction, 2013, 43(2): 105-109.
[7] 孙健家.安庆长江铁路大桥主桥钢梁边跨合龙施工技术[J].桥梁建设,2014,44(3):109-113.
SUN Jianjia. Construction techniques for closure of side span steel gird of main bridge of Anqing Changjiang river railway bridge[J]. Bridge Construction, 2014, 44(3): 109-113.
[8] 贺拴海,梅晓亮,刘鹏,等.宽幅钢箱梁斜拉桥空间行为数值分析[J].中国公路学报,2016,29(4):42-49.
HE Shuanhai, MEI Xiaoliang, LIU Peng, et al. Numerical analysis on spatial behavior of cable-stayed bridge with wide steel box girder[J]. China Journal of Highway and Transport, 2016, 29(4): 42-49.
[9] 严仁章,朱美豪,王帅,等.无铰索-拱复合结构设计与力学性能分析[J].重庆交通大学学报(自然科学版),2020,39(7):47-59.
YAN Renzhang, ZHU Meihao, WANG Shuai, et al. Design and mechanical properties analysis of cable-hingeless arch composite structure[J]. Journal of Chongqing Jiaotong University(Natural Science), 2020, 39(7): 47-59.
[10] 于祥敏,陈德伟.贵黔高速鸭池河特大桥钢桁梁合龙施工控制技术[J].桥梁建设,2017,47(6):101-105.
YU Xiangmin, CHEN Dewei. Construction control techniques for closure of steel truss girder of Yachi river bridge on Guiyang-Qianxi expressway[J]. Bridge Construction, 2017, 47(6): 101-105.
[11] 赵晓晋,景强,贺栓海,等.港珠澳大桥青州航道桥主梁合龙施工技术[J].桥梁建设,2017,47(5):117-121.
ZHAO Xiaojin, JING Qiang, HE Shuanhai, et al. Construction techni-ques for closure of main girder of Qingzhou ship channel bridge of Hong Kong-Zhuhai-Macao bridge [J]. Bridge Construction, 2017, 47(5): 117-121.
[12] 蔡军哲,司龙.三塔斜拉-自锚式悬索协作体系模型桥温度效应分析[J].重庆交通大学学报(自然科学版),2017,36(1):1-8.
CAI Junzhe, SI long. Analysis of temperature effect on cable-stayed self-anchored suspension composed model bridge with three towers[J]. Journal of Chongqing Jiaotong University(Natural Science), 2017, 36(1): 1-8.
[13] 彭琳琳,何承海,刘辉.多塔斜拉桥无应力合龙关键技术研究[J].世界桥梁,2015,43(1):59-64.
PENG Linlin, HE Chenghai, LIU Hui. Study of key unstressed closure techniques for multi-pylon cable-stayed bridge[J]. World Bridges, 2015, 43(1): 59-64.
[14] 贾少敏,赵雷,杨兴旺.嘉绍大桥主航道桥几何合龙控制[J].公路交通科技,2014,31(4):87-93.
JIA Shaomin, ZHAO Lei, YANG Xingwang. Geometry closure control of main channel bridge of Jiaxing-Shaoxing bridge[J]. Journal of Highway and Transportation Research and Development, 2014, 31(4): 87-93. |