[1] 陈庆香.贵州山区运营高速公路沥青路面小修养护技术适用性探讨[J].黑龙江交通科技,2019,42(10):154-155.
CHEN Qingxiang. Discussion on the applicability of minor repair and maintenance technology of asphalt pavement in Guizhou mountain operation expressway[J]. Communications Science and Technology Heilongjiang,2019,42(10):154-155.
[2] 寇东华.基于多传感器集成的无砟轨道轨道板裂缝与离缝自动检测装置[J].中国铁路,2020(4):93-99.
KOU Donghua. Multi-sensor integration-based automatic detection device for cracks and gaps of ballastless track slabs [J]. China Railways,2020(4):93-99.
[3] 王瑞,程建军,祁延录,等.高铁无砟轨道路基填料微膨胀机理试验研究[J].工程地质学报,2020,28(6):1350-1358.
WANG Rui, CHENG Jianjun, QI Yanlu, et al. Experimental study on micro-expansion mechanism of high speed ballastless track subgrade [J]. Journal of Engineering Geology,2020,28(6):1350-1358.
[4] 杨飞,王涛,杨建锋,等.板式无砟轨道路基翻浆及整修对轨道不平顺的影响研究[J].铁道建筑,2016(11):129-132.
YANG Fei, WANG Tao, YANG Jianfeng, et al. Research on influence of mud-pumping and renovation of slab ballastless track subgrade on track irregularity [J]. Railway Engineering,2016(11):129-132.
[5] 王登涛,路宏遥,孟翔震,等.轨道板表面裂缝的热成像检测效果仿真分析[J].智能计算机与应用,2020,10(2):132-137.
WANG Dengtao, LU Hongyao, MENG Xiangzhen, et al. Simulation analysis of thermal imaging detection effect of cracks on track plate surface [J]. Intelligent Computer and Applications ,2020,10(2):132-137.
[6] 马水生. 既有铁路路基基床病害机理与整治措施研究[D].长沙:中南大学,2013.
MA Shuisheng. Study on the Mechanism and Remediation Measures of Foundation Bed Disease of Existing Railway Subgrade [D]. Changsha:Central South University ,2013.
[7] 姚海林,郑少河,李文斌,等.降雨入渗对非饱和膨胀土边坡稳定性影响的参数研究[J].岩石力学与工程学报,2002(7):1034-1039.
YAO Hailin, ZHENG Shaohe, LI Wenbin, et al. Parametric study on the effect of rain infiltration on stability of unsaturated expansive soil slope [J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(7):1034-1039.
[8] 朱玉虎.路桥过渡段沉降差设计及施工控制策略[J].交通世界,2020(5):98-99.
ZHU Yuhu. Design and construction control strategy of settlement difference in road and bridge transition section [J].Transpo World ,2020(5):98-99.
[9] 安静,王友平. 寒区路桥过渡段在地下水作用下的沉降分析[J].中国建材科技,2020,29(2):55,57.
AN Jing, WANG Youping. Settlement analysis of transition section of road and bridge in cold area under action of groundwater [J]. China Building Materials Science & Technology, 2020,29(2):55,57.
[10] 韩沛池. 黄土区铁路路桥过渡段沉降监测及其机理分析[D]. 兰州:兰州交通大学,2020.
HAN Peichi. Monitoring and Mechanism Analysis on Settlement of the Transition Section of Railway Road and Bridge in Loess Region[D]. Lanzhou :Lanzhou Jiaotong University,2020.
[11] 王剑.兰新高速铁路路基上拱原因分析及整治措施[J].路基工程,2015(1):205-209.
WANG Jian. Cause analysis on subgrade arching of Lanzhou-Xinjiang high-speed railway and the control measures [J]. Subgrade Engineering,2015(1):205-209.
[12] 赵昌昌.路基膨胀土干湿循环效应的试验分析[J].福建交通科技,2021(2):45-48.
ZHAO Changchang. Experimental analysis of dry-wet circulation effect of expansive soil in subgrade[J]. Fujian Traffic Science and Technology,2021(2):45-48.
[13] 胡德彰.高速公路膨胀土路基施工技术探析[J].交通世界,2020(6):41-42.
HU Dezhang. Study on construction technology of expansive soil subgrade in expressway[J]. Transpo World,2020(6):41-42.
[14] 商拥辉,徐林荣,蔡雨,等.重载铁路循环动载下水泥改良膨胀土路基动力特性[J].中国铁道科学,2019,40(6):19-29.
SHANG Yonghui, XU Linrong, CAI Yu, et al. Dynamic characteristics of cement-improved expansive soil subgrade under cyclic dynamic load of heavy haul railway [J]. China Railway Science,2019,40(6):19-29.
[15] 雷瑜,李世新,廖靖云.蒙内铁路路基填料膨胀土改良适用性研究[J].路基工程,2019(2):5-10.
LEI Yu, LI Shixin, LIAO Jingyun. Study on applicability of expansive soil improvement for Mombasa-Nairobi railway subgrade filler [J]. Subgrade Engineering,2019(2):5-10.
[16] 朱永见,赵国堂,郑建.CRTSⅡ 型板式无砟轨道层间离缝产生原因分析[J].铁道学报,2021,43(2):111-117.
ZHU Yongjian, ZHAO Guotang, ZHENG Jian. Analysis on causes of gap under CRTSⅡ slab ballastless track[J]. Journal of the China Railway Society,2021,43(2):111-117. |