Abstract: Based on the principle of static equilibrium of cable,segmental curve equations of main cable with double-lifts in single span were established; formulae of the sag and horizontal tension were obtained; the influence of distance of doublelifts, span,self-weight,load and the like on horizontal tension was analyzed. Results indicated that the ratio of distance of double-lifts and span of main cable played an important role in affecting horizontal tension of the cable; the tolerance by the method of double-lifts and single-lift was quite small,which can be ignored.
Key words: non-support cable crane system, horizontal tension of main cable, double-lifts, segment curve equations, sag of main cable
摘要: 利用缆索静力平衡原理,建立了主缆按双吊点位置的分段曲线方程,推导了相应的主缆垂度和水平张力计算 公式,分析了主缆双吊点距离、主缆跨径、主缆自重及吊重等参数对水平张力的影响。结果表明:影响主缆水平张 力的主要因素是两吊点间距与主缆跨径之比,当两者之比在0.05以内时,用单吊点法和双吊点法计算结果差异很 小,可忽略不计。
关键词: 无支架缆索吊装系统, 主缆水平张力, 双吊点, 分段曲线方程, 主缆垂度
CLC Number:
U443.38
LIU Rui,LEI Yu-liang,ZHOU Shui-xing. Calculation of Main Cable with Double-lifts in Single Span with Non-support Cable Crane System[J]. Journal of Chongqing Jiaotong University(Natural Science), 2010, 29(6): 841-845.
刘睿,雷雨亮,周水兴. 无支架缆索吊装系统单跨双吊点主缆计算[J]. 重庆交通大学学报(自然科学版), 2010, 29(6): 841-845.