On the Construction Water Level of Wharf in Mountainous Rivers

WEN Yan-qing,WANG Duo-yin,SONG Cheng-tao,HUANG Ran   

  1. School of River & Ocean Engineering,Chongqing Jiaotong University,Chongqing 400074,China
  • Received:2010-05-02 Revised:2010-09-05 Online:2010-12-15 Published:2015-01-22

关于山区河流码头施工水位的讨论

温焰清,王多垠,宋成涛,黄然   

  1. 重庆交通大学河海学院,重庆 400074
  • 作者简介:温焰清(1985—),女,山西寿阳人,硕士研究生,主要从事港口、海岸工程结构方面的研究。E-mail:wenyanqing227@163.com。
  • 基金资助:
    重庆市重大科技专项基金项目( CSTC,2009AA6029)

Abstract: After the Three Gorges Reservoir was built,the experience value could not be applied to determining construction levels of inland mountainous river. After taking Cuntan Wharf as an example,the monthly average water level and water level after the completion of each month in natural situation were analyzed and the number of days of continuous construction was obtained. The said number was compared to the estimated construction period based on engineering quantity; adjustments were made according to specific flood of special circumstances. Compared to traditional method of experience, the present one was more accurate and reasonable and it could play a positive role in improving construction quality and reducing costs.

Key words: wharf in mountainous rivers, Cuntan, construction water level

摘要: 三峡成库后,经验取值的方法不再适用于内河山区河流码头建设的施工水位确定。以寸滩码头为例,分析了 码头所在河段天然情况下历年各月平均水位、成库后各月水位后,得出可连续施工天数;结合工程量,将其与预计 施工工期对比,再视特殊具体洪水情况,作出调整。该方法较传统经验取值法更为准确、合理,对施工质量及经济 效益等方面都有积极作用。

关键词: 山区河流码头, 寸滩, 施工水位