Abstract: The main bridge of Edong Changjiang River Bridge is a hybrid girder cable-stayed bridge with 1km main span. The structure behavior features of Edong Changjiang River Bridge's construction are in troduced, including obvious non-linearity and independence between mid-span and side span in construction period, which are different from the features of steel box girder cabled bridge. According to structural behavior in construction period, overall control concepts, control key factors, line shape control method, stress control method in mid-span and side span, cable tension control method are discussed. Construction experience indicates that the theoretical calculation is in well accordance with the field results; line shape conditions correspond to the stress conditions and the structure is under control, which proves the availability of those key methods.
Key words: cable=stayed bridge, construction control , line shape control, stress control
摘要: 鄂东长江大桥为千米级混合梁斜拉桥,通过研究探明了鄂东长江大桥施工期结构行为特点,指出了超大跨度 的混合梁斜拉桥具有非线性特征突出、边中跨的结构行为有一定的独立性等有别于全钢箱梁斜拉桥的特点。从施 工期结构行为入手,就总体控制理念、边中跨控制重点、边中跨线形控制方法、施工期中跨钢箱梁应力调控、边跨应 力控制、拉索张拉控制等关键技术问题进行了深入探讨。施工实践表明:实测结果与理论结果吻合较好,线形情况 与应力情况对应,结构处于可控状态,证实了上述关键技术的有效性。
关键词: 斜拉桥, 施工控制, 线形控制, 应力控制
CLC Number:
U448.27
HUANG Bing-shi, TANG Shou-feng, ZHAO Can-hui. Structure Behavior and Construction Monitoring Key Technology in Construction of Edong Changjiang River Bridge[J]. Journal of Chongqing Jiaotong University(Natural Science), 2010, 29(5): 688-692.
黄冰释, 唐守峰, 赵灿晖. 鄂东大桥施工期结构行为与施工监控关键技术[J]. 重庆交通大学学报(自然科学版), 2010, 29(5): 688-692.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://xbzk.cqjtu.edu.cn/EN/
http://xbzk.cqjtu.edu.cn/EN/Y2010/V29/I5/688